Most real costs are a mixture. A phone bill has a line rental that never changes and call charges that depend on use. To budget, to price and to judge performance, a manager needs to know how much of a cost is fixed and how much varies.

Cost segregation is the job of splitting a mixed cost into those two parts, and the high-low method is the simplest way of doing it.

This is one of the most reliably examined techniques in the paper. It can appear as a straightforward calculation, as one half of a longer question next to regression analysis, or in a harder form with a step in fixed costs or a change in variable cost per unit.

This page covers every version the syllabus shows, with the reasoning behind each step, so that you can handle whatever the examiner sets.

In 30 seconds

Total cost is modelled as y = a + bx, where a is the fixed cost per period and b is the variable cost per unit. The high-low method takes the highest and lowest activity levels and their costs. The extra cost between them is all variable, so b = change in cost ÷ change in units. Then a = total cost − (b × units), using either point.

If fixed costs step up between the two points, adjust one total so both share the same fixed cost. If variable cost per unit changes, find a third level so that two levels share the same unit variable cost.

Cost segregation and the cost function

The total costs of a business, or of part of it such as a production line, are the sum of its fixed and variable costs. In other words, the total is semi-variable in nature. Cost segregation is the process of splitting total costs into fixed and variable parts. When it can be done, total cost can be written as a formula:

y = a + bx

y = total cost in the period; x = number of units of output or volume of activity; a = fixed costs in the period; b = variable cost per unit of output or activity.

On a graph with activity on the horizontal axis and total cost on the vertical axis, this equation is a straight line. The line starts at height a (the fixed cost) and slopes upwards, and the gradient of the line is b, the variable cost per unit.

The linear total cost functionA graph of total cost against activity. A straight line starts on the vertical axis at the fixed cost a and rises to the right. Its slope is the variable cost per unit b.aCost (y)Activity (x)Slope = bFixed cost a
Total cost = fixed cost a + variable cost per unit b multiplied by activity x.

Once the equation is known, it can be used for cost estimation: working out the likely total cost at any planned activity level. Segregation and estimation are both very useful in forecasting and decision making. Two techniques build the equation: high-low analysis and linear regression analysis. This topic covers the first. The next topic covers the second.

The high-low method

High-low analysis can estimate fixed cost and variable cost per unit whenever three conditions hold:

  1. total cost figures are available for at least two different levels of activity;
  2. fixed costs can be assumed to be the same in total at each level; and
  3. the variable cost per unit can be assumed constant at both levels.

The method uses two historical records: the highest recorded activity and its total cost, and the lowest recorded activity and its total cost. It assumes that these two records are representative of costs at all levels. Because fixed costs are the same in total at both levels, the difference in total cost between the high and low points is entirely variable cost.

The four steps

  1. Identify the highest and lowest activity levels and note the total cost at each.
  2. Variable cost per unit = (high cost − low cost) ÷ (high units − low units).
  3. Fixed cost: substitute b into either the high or the low figures. Fixed cost = total cost − (variable cost per unit × units).
  4. Write the cost function y = a + bx.

Important: choose the high and low points by activity level, not by cost. The highest cost does not always occur at the highest activity.

Worked example

A print shop records the number of jobs completed and its total monthly cost over six months.

MonthJobsTotal cost (₦)
January3,00033,000
February5,20046,500
March6,00051,000
April3,80038,000
May4,50043,000
June5,60048,000
  1. Step 1. The highest activity is March (6,000 jobs, ₦51,000). The lowest is January (3,000 jobs, ₦33,000). Notice that the highest cost and highest activity happen to coincide here, but you must still pick by activity.
  2. Step 2.
    Difference in activity = 6,000 − 3,000 = 3,000 jobs.
    Difference in cost = ₦51,000 − ₦33,000 = ₦18,000.
    Variable cost per job = ₦18,000 ÷ 3,000 = ₦6.
  3. Step 3.
    Using the high point: fixed cost = ₦51,000 − (6,000 × ₦6) = ₦51,000 − ₦36,000 = ₦15,000.
    Using the low point gives the same: ₦33,000 − (3,000 × ₦6) = ₦15,000.
  4. Step 4.
    Total cost = ₦15,000 + ₦6x.

It does not matter which point you substitute into, and doing both is a good check on your arithmetic. The function will not reproduce the middle months exactly. At 5,200 jobs it gives ₦15,000 + (5,200 × ₦6) = ₦46,200 against an actual ₦46,500. That small gap is the price of using only two observations.

Using the cost function to forecast

The equation can estimate cost at any planned level, including levels outside the observed range. For 4,000 jobs: total cost = ₦15,000 + (₦6 × 4,000) = ₦15,000 + ₦24,000 = ₦39,000.

When the data is given as a capacity percentage

A workshop budgets 72,000 machine hours, which is 80% of capacity, at a total cost of ₦468,000. At 100% capacity the total cost would be ₦540,000. First convert to hours at full capacity: 72,000 ÷ 0.80 = 90,000 hours. High: 90,000 hours, ₦540,000. Low: 72,000 hours, ₦468,000. Difference: 18,000 hours and ₦72,000, so variable cost per hour = ₦72,000 ÷ 18,000 = ₦4. Fixed cost = ₦540,000 − (90,000 × ₦4) = ₦540,000 − ₦360,000 = ₦180,000. Check with the low point: ₦468,000 − (72,000 × ₦4) = ₦468,000 − ₦288,000 = ₦180,000.

A service example

A pump repair unit records, over five months, the number of pumps repaired and its repair costs: 18 pumps ₦21,400; 30 pumps ₦28,600; 12 pumps ₦17,800; 25 pumps ₦25,100; 20 pumps ₦22,000. The high is 30 pumps (₦28,600) and the low is 12 pumps (₦17,800). Difference: 18 pumps and ₦10,800, so variable cost per pump = ₦10,800 ÷ 18 = ₦600. Fixed cost per month = ₦17,800 − (12 × ₦600) = ₦17,800 − ₦7,200 = ₦10,600. Estimated cost for 22 pumps = ₦10,600 + (22 × ₦600) = ₦10,600 + ₦13,200 = ₦23,800.

When fixed costs have a step

High-low analysis still works if fixed costs step up between the low and high activity levels, provided the size of the step is known. The idea is to put both observations on the same fixed-cost footing before comparing them.

Step given in naira

  1. Identify the highest and lowest activity levels.
  2. Adjust one of the totals: add the step to the cost at the lower level, or deduct the step from the cost at the higher level.
  3. Variable cost per unit = (difference in adjusted costs) ÷ (difference in units).
  4. Find the fixed cost by substitution, using the unadjusted pair.
  5. Write the cost function for the unadjusted level.
  6. Write the function for the other side of the step by reversing the adjustment to the fixed cost.

Example. A caterer’s fixed costs rise by ₦12,000 once activity reaches 8,000 meals or more. High: 11,000 meals, ₦95,000. Low: 6,000 meals, ₦58,000.

  • Adjust the low.
    ₦58,000 + ₦12,000 = ₦70,000.
  • Difference: 5,000 meals and ₦25,000 (₦95,000 − ₦70,000).
    Variable cost = ₦25,000 ÷ 5,000 = ₦5 per meal.
  • Fixed cost above the step.
    ₦95,000 − (11,000 × ₦5) = ₦95,000 − ₦55,000 = ₦40,000.
    For 8,000 meals or more, total cost = ₦40,000 + ₦5x.
  • Below the step.
    fixed cost = ₦40,000 − ₦12,000 = ₦28,000, so total cost = ₦28,000 + ₦5x.
    (Check with the original low point: ₦58,000 − (6,000 × ₦5) = ₦28,000.)
  • For 9,000 meals (above the step): ₦40,000 + (9,000 × ₦5) = ₦85,000.

Step given as a percentage

If the step is a percentage, you cannot adjust a total in naira because you do not know the fixed cost yet. You need a third activity level. Choose two levels on the same side of the step, so they share the same fixed cost, and use them to find the variable cost per unit.

Then find the fixed cost on that side, and work out the fixed cost on the other side from the percentage.

Example. A laundry’s fixed costs rise by 25% when activity reaches 9,000 loads or more. Variable cost per load is constant. High: 14,000 loads, ₦187,000. Middle: 10,000 loads, ₦155,000. Low: 6,000 loads, ₦108,000.

  • The high and middle points are both above 9,000, so they share the same fixed cost.
  • Difference.
    4,000 loads and ₦32,000, so variable cost = ₦32,000 ÷ 4,000 = ₦8 per load.
  • Fixed cost above the step.
    ₦187,000 − (14,000 × ₦8) = ₦187,000 − ₦112,000 = ₦75,000.
    Function at 9,000 loads or more: ₦75,000 + ₦8x.
  • Fixed cost below the step.
    the higher figure is 125% of the lower one, so lower = ₦75,000 ÷ 1.25 = ₦60,000.
    Function below 9,000 loads: ₦60,000 + ₦8x.
    (Check with the low point: ₦108,000 − (6,000 × ₦8) = ₦60,000.)

When the variable cost per unit changes

The variable cost per unit may fall at high volumes, for instance because of bulk discounts. The same approach applies: use a third level so that two levels share the same variable cost per unit.

Example. A packaging firm’s fixed costs are constant. Variable cost per unit falls by 20% for all units once activity exceeds 15,000 units. High: 22,000 units, ₦182,000. Middle: 18,000 units, ₦158,000. Low: 12,000 units, ₦140,000.

  • High and middle are both above 15,000, so they share the same variable cost per unit.
  • Difference.
    4,000 units and ₦24,000, so variable cost above 15,000 units = ₦24,000 ÷ 4,000 = ₦6.
  • Below 15,000 the unit variable cost is higher.
    If ₦6 is 80% of the original, the original is ₦6 ÷ 0.80 = ₦7.50.
  • Fixed cost.
    ₦182,000 − (22,000 × ₦6) = ₦182,000 − ₦132,000 = ₦50,000.
  • Function above 15,000 units: ₦50,000 + ₦6x. Below 15,000 units: ₦50,000 + ₦7.50x.
    (Check with the low point: ₦50,000 + 12,000 × ₦7.50 = ₦140,000.)

The ideas in more depth

Why the difference is all variable

Suppose total cost is ₦48,700 at the high point and ₦40,300 at the low point. Both totals contain the same fixed cost. When you subtract one from the other, the fixed cost cancels, and what is left is the extra variable cost caused by the extra units. Dividing by the extra units gives the cost of one more unit.

Strengths and weaknesses

StrengthsWeaknesses
Simple and quick, with no advanced arithmeticUses only two observations and ignores all the others
Needs only the highest and lowest recordsThe high and low points may be unusual, so the result may not be representative
Easy to explain to managersAssumes costs are linear, with fixed cost constant and variable cost per unit constant
Can handle a known step in fixed costs or a known change in variable costGives no measure of how reliable the estimate is, unlike regression with its correlation coefficient

Checking your answer

Always test the cost function on the point you did not use. If you built it from the high point, substitute the low point and see whether you reproduce its cost. If you get a different figure, you have made an arithmetic error or the data does not fit the method.

Common ways the question is set

  • A table of months with units and costs. Pick the highest and lowest units.
  • Capacity percentages, as in the 85% example. Convert them to units first.
  • A given cost function to use for a flexible budget.
  • Paired with regression, where you are asked to compare the two answers.

Worked example: a bakery

Scenario. A bakery records the following for six months: 3,000 loaves, ₦51,000; 4,200 loaves, ₦61,000; 5,000 loaves, ₦66,500; 3,600 loaves, ₦56,000; 4,800 loaves, ₦65,000; 5,600 loaves, ₦71,800. Use the high-low method to find the cost function. Estimate the cost of 4,000 loaves and check the function on a month you did not use.

  1. High and low by activity. High: 5,600 loaves, ₦71,800. Low: 3,000 loaves, ₦51,000.
  2. Variable cost per loaf.
    (₦71,800 − ₦51,000) ÷ (5,600 − 3,000) = ₦20,800 ÷ 2,600 = ₦8.
  3. Fixed cost.
    ₦71,800 − (5,600 × ₦8) = ₦71,800 − ₦44,800 = ₦27,000.
    Check: ₦51,000 − (3,000 × ₦8) = ₦51,000 − ₦24,000 = ₦27,000.
  4. Cost function. y = 27,000 + 8x.
  5. Estimate for 4,000 loaves.
    ₦27,000 + (4,000 × ₦8) = ₦27,000 + ₦32,000 = ₦59,000.
  6. Check on an unused month.
    At 4,800 loaves the function gives ₦27,000 + (4,800 × ₦8) = ₦65,400, against an actual ₦65,000.
    The small gap of ₦400 shows the estimate is reasonable, though it also shows that the two end points alone do not capture every month exactly.

The scattergraph method

The high-low method uses two points only. The scattergraph method uses all of them, by eye. Plot output on the horizontal axis and total cost on the vertical axis, mark every observation, and draw a straight line through the middle of the points so that about as many lie above as below.

Where the line cuts the vertical axis is the estimate of fixed cost, and the slope is the variable cost per unit.

Data. Output (units) and total cost (₦): 2,000 → 31,000; 3,000 → 36,000; 4,000 → 43,000; 5,000 → 47,000; 6,000 → 55,000.

  • High-low:
    variable cost = (55,000 − 31,000) ÷ (6,000 − 2,000) = ₦6 a unit.
    Fixed cost = 31,000 − (2,000 × 6) = ₦19,000.
  • Scattergraph: a line drawn through the five points would cut the vertical axis at about ₦19,000 to ₦20,000, and rise by about ₦6 for each extra unit.
    The middle three points lie close to the line y = 19,000 + 6x (which gives 37,000, 43,000 and 49,000 at 3,000, 4,000 and 5,000 units, against actual 36,000, 43,000 and 47,000).

The scattergraph shows whether the relationship is really linear and whether any observation is an outlier. Its weakness is that a line drawn by eye is subjective, so two people can draw slightly different lines. Regression removes this subjectivity.

The three methods compared

High-lowScattergraphLeast squares regression
Data usedTwo points onlyAll points, judged by eyeAll points, calculated
SpeedFastestQuick but needs a graphLongest by hand
SubjectivityNoneHighNone
ReliabilityLow if the extreme points are unusualModerateHighest
Shows data qualityNoYes (outliers visible)Yes, through r

When costs are recorded at different price levels

If inflation has pushed prices up between the high and low months, the cost difference includes a price effect as well as a volume effect. The variable cost will be overstated. Adjust all costs to the same price level first. Example. At 4,000 units, cost was ₦46,000 when the price index was 100. At 6,000 units, cost was ₦66,000 when the index was 110.

  1. Restate the later cost at the earlier price level: ₦66,000 × 100 ÷ 110 = ₦60,000.
  2. Variable cost.
    (₦60,000 − ₦46,000) ÷ (6,000 − 4,000) = ₦7 a unit (at index 100).
  3. Fixed cost.
    ₦46,000 − 4,000 × ₦7 = ₦18,000 (at index 100).

To forecast cost at a future price level, multiply the answer by the expected index. At an index of 120 and 5,000 units, cost = (₦18,000 + 5,000 × ₦7) × 1.20 = ₦53,000 × 1.20 = ₦63,600. Without the adjustment, the high-low method would have given ₦10 a unit (₦20,000 ÷ 2,000), a big overstatement.

Splitting a semi-variable overhead for a budget

Budgets often need the fixed and variable parts of a cost such as electricity. Suppose the electricity bill was ₦92,000 in a month of 10,000 machine hours and ₦116,000 in a month of 14,000 machine hours.

  • Variable cost.
    (₦116,000 − ₦92,000) ÷ (14,000 − 10,000) = ₦6 per machine hour.
  • Fixed cost.
    ₦92,000 − 10,000 × ₦6 = ₦32,000 a month.
  • Budget for 12,000 machine hours = ₦32,000 + 12,000 × ₦6 = ₦104,000.

The same figures feed a flexible budget: fixed ₦32,000 plus ₦6 for each machine hour, whatever the activity. This is how the budget cost allowance in the budgeting topic is found in practice.

Where the cost equation is used

  • Flexible budgets: to find the allowed cost at the actual activity level.
  • Cost-volume-profit (CVP) analysis: the variable cost per unit and fixed cost are the inputs for break-even and target profit.
  • Pricing and special orders: the variable cost per unit shows the minimum price.
  • Forecasting: total cost at a future activity level.
  • Standard costs: the variable overhead rate per hour.

Common mistakes in the exam

  • Picking the highest and lowest costs instead of the highest and lowest activity levels.
  • Dividing the cost difference by the wrong number of units, or by the total units instead of the difference.
  • Forgetting to find the fixed cost after finding the variable cost.
  • Using the variable cost for only one of the two points and getting different fixed costs. Check both.
  • Not adjusting for a known step in fixed cost, or adjusting the wrong total (add to the low or deduct from the high, not both).
  • Mixing up the two sides of a step when forecasting. Use the function that fits the activity level asked for.
  • Writing the final equation with a and b the wrong way round.

Quick revision

  • y = a + bx. a = fixed cost. b = variable cost per unit (the gradient).
  • b = (high cost − low cost) ÷ (high units − low units). a = total cost − b × units.
  • Step in fixed costs given in naira: add to the low total or deduct from the high total. Find b, find a on the unadjusted pair, then reverse the adjustment for the other side.
  • Step given as a percentage, or a percentage change in variable cost: use a third level so that two levels share the same fixed cost (or same unit variable cost).
  • Check with the other point. Use the function to estimate cost at any activity level.
  • High-low uses two points only. Regression uses all points and measures reliability.

Practice questions

These are original questions written in the style of the Institute of Chartered Accountants of Nigeria (ICAN) exam. Try each one before you open the answer.

Section A style: multiple choice

Question 1. In the cost equation y = a + bx, the letter b stands for:

  1. Fixed cost per period
  2. Variable cost per unit
  3. Total cost
  4. Number of units
Show the answer

B. b is the gradient of the line, the variable cost per unit.

Question 2. The highest activity was 9,000 units with total cost ₦150,000 and the lowest was 4,000 units with total cost ₦90,000. The variable cost per unit is:

  1. ₦8
  2. ₦10
  3. ₦12
  4. ₦16.67
Show the answer

C. (₦150,000 − ₦90,000) ÷ (9,000 − 4,000) = ₦60,000 ÷ 5,000 = ₦12.

Question 3. Using the data in Question 2, the fixed cost is:

  1. ₦42,000
  2. ₦48,000
  3. ₦90,000
  4. ₦108,000
Show the answer

A. ₦150,000 − (9,000 × ₦12) = ₦150,000 − ₦108,000 = ₦42,000.

Question 4. A cost function is ₦30,000 + ₦4x. The total cost at 6,000 units is:

  1. ₦24,000
  2. ₦54,000
  3. ₦60,000
  4. ₦180,000
Show the answer

B. ₦30,000 + (6,000 × ₦4) = ₦54,000.

Question 5. The high-low method assumes that:

  1. Fixed cost per unit is constant
  2. Fixed costs are the same in total and variable cost per unit is constant at both levels
  3. Variable costs do not exist
  4. The highest cost is always at the highest output
Show the answer

B. These are the stated conditions.

Question 6. Fixed costs rise by ₦10,000 at 5,000 units or more. High: 8,000 units, ₦100,000. Low: 3,000 units, ₦60,000. The variable cost per unit is:

  1. ₦6
  2. ₦8
  3. ₦4
  4. ₦10
Show the answer

A. Adjust the low: ₦60,000 + ₦10,000 = ₦70,000. Difference = ₦30,000 over 5,000 units = ₦6.

Question 7. A weakness of the high-low method is that it:

  1. Needs a computer
  2. Uses only two observations
  3. Cannot find fixed cost
  4. Always gives a negative variable cost
Show the answer

B. All other observations are ignored.

Question 8. Splitting a mixed cost into fixed and variable parts is called:

  1. Cost absorption
  2. Cost segregation
  3. Cost coding
  4. Cost apportionment
Show the answer

B. Cost segregation.

Question 9. Total cost was ₦48,000 at 12,000 units and the variable cost per unit is ₦3. The fixed cost is:

  1. ₦8,000
  2. ₦12,000
  3. ₦36,000
  4. ₦48,000
Show the answer

B. ₦48,000 − (12,000 × ₦3) = ₦48,000 − ₦36,000 = ₦12,000.

Question 10. A budget is set at 70% of capacity for 7,000 hours. The hours at 100% capacity are:

  1. 7,700
  2. 9,000
  3. 10,000
  4. 12,000
Show the answer

C. 7,000 ÷ 0.70 = 10,000 hours.

Section B style: written questions

Question 11 (10 marks). A workshop has the following data. Month 1: 2,000 jobs, ₦138,000. Month 2: 3,500 jobs, ₦180,000. Month 3: 5,000 jobs, ₦235,000. Month 4: 4,000 jobs, ₦200,000. Month 5: 2,500 jobs, ₦150,000. (a) Use the high-low method to find the cost function. (7 marks) (b) Estimate the cost of 4,500 jobs. (3 marks)

Question 12 (20 marks). Lekki Logistics Ltd records its total delivery costs.

(a) Explain the three conditions under which the high-low method can be used. (3 marks)

(b) Fixed costs rise by ₦20,000 when activity reaches 10,000 deliveries. The highest activity was 14,000 deliveries at a cost of ₦126,000. The lowest was 6,000 deliveries at a cost of ₦74,000. Variable cost per delivery is constant. Find the variable cost per delivery and the two cost functions, and estimate the cost of 8,000 and 12,000 deliveries. (11 marks)

(c) State three limitations of the high-low method. (3 marks)

(d) Explain how a third activity level would be used if the step were given as a percentage. (3 marks)

A further written question

Question 13 (10 marks). Fixed costs are constant at ₦60,000. Variable cost per unit falls by 10% for all units once activity exceeds 30,000 units. Costs: 40,000 units ₦276,000; 35,000 units ₦249,000; 20,000 units ₦180,000. (a) Find the variable cost per unit above and below 30,000 units. (6 marks) (b) Write the two cost functions and check them. (4 marks)

Model answers

Show the model answer to Question 11

(a)

  1. The highest activity is 5,000 jobs (₦235,000) and the lowest is 2,000 jobs (₦138,000).
  2. Difference in activity = 3,000 jobs.
  3. Difference in cost.
    ₦235,000 − ₦138,000 = ₦97,000.

Variable cost per job = ₦97,000 ÷ 3,000 = ₦32.33 (approximately).

Fixed cost, using the high point: ₦235,000 − (5,000 × ₦32.33) = ₦235,000 − ₦161,667 = ₦73,333. Check with the low point: ₦138,000 − (2,000 × ₦32.33) = ₦138,000 − ₦64,667 = ₦73,333.

Cost function: y = 73,333 + 32.33x (or exactly 73,333.33 + 32.3333x).

(b)

  1. For 4,500 jobs: ₦73,333 + (4,500 × ₦32.33) = ₦73,333 + ₦145,500 = ₦218,833 (approximately).
  2. Using exact figures.
    ₦73,333.33 + ₦145,500 = ₦218,833.33.
Show the model answer to Question 12

(a) Conditions. (1) Total cost figures must be available for at least two different levels of activity. (2) Fixed costs must be assumed to be the same in total at each level of activity. (3) The variable cost per unit must be assumed constant at both levels.

(b) Calculation.

  1. The step is ₦20,000 at 10,000 deliveries.
  2. The high point (14,000) is above the step and the low point (6,000) is below it.
  3. Adjust the low cost by adding the step.
    ₦74,000 + ₦20,000 = ₦94,000.
  4. Difference in cost.
    ₦126,000 − ₦94,000 = ₦32,000.
  5. Difference in activity.
    14,000 − 6,000 = 8,000 deliveries.
  6. Variable cost per delivery.
    ₦32,000 ÷ 8,000 = ₦4.

Fixed cost at or above 10,000 deliveries (from the unadjusted high point): ₦126,000 − (14,000 × ₦4) = ₦126,000 − ₦56,000 = ₦70,000. Function for 10,000 deliveries or more: y = 70,000 + 4x.

Fixed cost below 10,000 deliveries: ₦70,000 − ₦20,000 = ₦50,000. Function below 10,000: y = 50,000 + 4x. Check with the low point: ₦50,000 + (6,000 × ₦4) = ₦74,000, which matches.

Estimates: 8,000 deliveries (below the step): ₦50,000 + (8,000 × ₦4) = ₦82,000. 12,000 deliveries (above the step): ₦70,000 + (12,000 × ₦4) = ₦118,000.

(c) Limitations. It uses only two observations and ignores the rest; the high and low points may be unrepresentative; it assumes costs are strictly linear; and it gives no measure of reliability.

(d) Percentage step. The fixed cost is unknown, so the naira adjustment cannot be made. A third activity level is needed. Two levels that lie on the same side of the step share the same fixed cost, so they are compared to find the variable cost per unit. Fixed cost on that side is found by substitution.

The fixed cost on the other side is then found by applying the percentage, for example dividing by 1.20 if the step is a 20% increase and the known fixed cost is the higher one.

Show the model answer to Question 13

(a)

  1. The 40,000 and 35,000 levels are both above 30,000, so they share the same variable cost per unit.
  2. Difference in cost.
    ₦276,000 − ₦249,000 = ₦27,000.
  3. Difference in units = 5,000.
  4. Variable cost above 30,000 units = ₦27,000 ÷ 5,000 = ₦5.40.
  5. This is 90% of the unit cost below 30,000, so the cost below 30,000 = ₦5.40 × 100/90 = ₦6.00.

(b)

  1. Fixed cost.
    ₦276,000 − (40,000 × ₦5.40) = ₦276,000 − ₦216,000 = ₦60,000, which agrees with the stated fixed cost.
  2. Above 30,000 units: y = 60,000 + 5.4x.
  3. Below 30,000 units: y = 60,000 + 6x.
  4. Check the low point.
    ₦60,000 + (20,000 × ₦6) = ₦180,000, which matches.

Pathfinder on High-low method and cost segregation

These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.

November Diet, 2025: Question 3 (20 marks)

Part (a)(i), worth 5 marks, asks for the fixed and variable elements of a mixed cost using the high-low method from ten months of output and expense data. Parts (a)(ii) and (b) belong to the next topic.

Revise first: The high-low method

November Diet, 2015: Section A, Question 7 (multiple choice)

From the previous syllabus. Asks you to use the high-low method to find fixed and variable cost from given figures.

Revise first: The high-low method

November Diet, 2023: Section A, Question 10 (multiple choice)

From the previous syllabus. Asks which method separates fixed costs from semi-variable costs.

Revise first: Cost segregation and the cost function

Section A of each diet (multiple choice)

Multiple-choice items often ask for the variable cost per unit or the fixed cost from two data points, and may involve a step in fixed costs. Check Section A of every diet you practise.

Revise first: When fixed costs have a step

Source: ICAN Pathfinder, Management Accounting. Diets covered: November Diet, 2025, November Diet, 2023 and November Diet, 2015 (previous syllabus). May Diet, 2025 and November Diet, 2024 are not covered here.

Spotted a mistake? Tell us and we will check it.

Where this fits

See every past question on Management Accounting and the topic each one tests in the Pathfinder question finder.

After it, move on to Performance Management.

All Management Accounting topics

You are reading topic 8 of 41.

  1. Data, information and the qualities of good information01
  2. Nature and purpose of management accounting02
  3. Management information systems03
  4. Spreadsheets in cost and management accounting04
  5. Big data and data analytics05
  6. Cost classification by element, function and behaviour06
  7. Direct and indirect costs, product and period costs, and cost codification07
  8. Cost segregation and the high-low method08 here
  9. Linear regression and the correlation coefficient09
  10. Inventory procedures, documents and records10
  11. Inventory valuation: FIFO, LIFO and average cost11
  12. Economic order quantity and inventory control levels12
  13. Just-in-time and other inventory management systems13
  14. Labour costs, recording and remuneration methods14
  15. Labour turnover and payroll accounting15
  16. Manufacturing overheads and the stages of absorption costing16
  17. Overhead apportionment and service department costs17
  18. Overhead absorption, under- and over-absorption, fixed and variable overheads18
  19. Job costing and batch costing19
  20. Process costing: normal loss, abnormal loss and abnormal gain20
  21. Process costing: equivalent units and work-in-progress21
  22. Joint products and by-products22
  23. Service costing23
  24. Marginal and absorption costing: preparing profit statements24
  25. Reconciling profits and comparing marginal and absorption costing25
  26. Cost control and cost reduction26
  27. Forecasting: types, process and methods27
  28. Time series analysis and moving averages28
  29. Lines of best fit and seasonal variations29
  30. The budgeting system, principal budget factor and budget process30
  31. Preparing functional budgets31
  32. Cash budgets and the master budget32
  33. Standard costing: purposes, operation and standard cost cards33
  34. Direct material and direct labour variances34
  35. Variable and fixed production overhead variances35
  36. Sales variances and reconciling budgeted and actual profit36
  37. Cost-volume-profit analysis and break-even point37
  38. Margin of safety and break-even charts38
  39. Relevant cost analysis39
  40. Limiting factors and make-or-buy decisions40
  41. Other short-term decisions and shutdown decisions41
See the whole course

Get the complete Management Accounting notes

Download as PDF or Word

  • Every topic as PDF and Word, ready to print
  • Edit it in Word or print the PDF. No retyping.
Get this course

Reading stays free. Access lasts 12 months. Pay by card, bank transfer, USSD or QR through Paystack. Your name and email appear on every page of your files. Read our Refund Policy.

PracticeNext topic