Two accountants cost the same factory. One divides all overhead by machine hours. The other traces each overhead to the activity that causes it. They use the same total cost, the same products and the same sales, and they report the same total profit. But they disagree about which products make money, and the manager who follows the first accountant may drop a profitable product and keep a loss-maker.
This topic compares activity based costing with the traditional method of absorbing overhead, shows the difference in numbers using one data set, and weighs the advantages and disadvantages of each. It builds on the activity based costing calculations topic. The next topic starts target costing.
In 30 seconds
Traditional absorption costing uses one volume-based rate: overhead absorption rate = overhead ÷ volume of a production resource such as direct labour hours or machine hours. ABC uses several rates, one for each activity, based on cost drivers. ABC is more accurate because it follows the activities used, more complex and costly, and gives better information for pricing, product mix and cost control.
Traditional costing is simple, is accepted for inventory valuation and external reporting, but can distort product costs when overhead is large and products differ in volume, batch size or complexity. The two give the same total overhead and profit but spread it differently between products. ABC works best where overhead is a large part of cost, products are complex or made to order, and order sizes differ.
Its disadvantages are cost, unreliable data and assumptions, historical rather than future costs, remaining apportionments and difficulty in choosing drivers. Full marks come from comparing method with method, and from showing the effect in figures.
Traditional absorption and ABC side by side
The traditional method spreads production overhead to products on the volume of production resources they consume, such as direct labour hours or machine hours. The overhead absorption rate is overhead divided by the volume of the chosen resource, and each product is charged rate times the hours it uses. It treats every overhead as if it varied with that one measure.
ABC splits the total overhead into pools and charges each pool according to what drives it.
- Cost driver. Traditional: a single driver. ABC: multiple drivers, one for each activity.
- Allocation. Traditional: on the total of one driver. ABC: on the activities each product uses.
- Accuracy. Traditional: less accurate, because it is an average. ABC: more accurate, because it reflects the activities actually used.
- Complexity. Traditional: simple and cheap to calculate. ABC: more complex and costly.
- Focus. Traditional: simple product cost for valuation. ABC: better information for decisions on pricing and product mix, and for cost control and cost reduction.
- Use. Traditional: external reporting and regulatory purposes. ABC: internal reporting and performance analysis.
The central difference is the effect of batch size and complexity. Where each product needs the same amount of activity per unit, the two methods give similar answers. Where a product is made in small batches, or needs many set-ups, inspections, orders and deliveries for its volume, the volume-based rate under-charges it and over-charges the simple, high-volume products that subsidise it.
When ABC is suitable
- A manufacturer that needs absorption costing for inventory valuation.
- Overhead is a large proportion of production cost and direct labour is small.
- Products are complex, or made to customer specification.
- Order sizes differ substantially, and order handling and despatch costs are significant.
Advantages and disadvantages
Advantages of ABC
- It gives information about the activities that drive overhead, which traditional absorption and marginal costing do not.
- It helps with long-term cost control, product selection and pricing.
- Each product carries a fair share of overhead based on the activities needed to make and sell it, so costs are more realistic. It can be argued, though, that full product cost has little practical meaning for management.
- In the long run all overhead is variable, so measuring costs by activity helps control the activities and long-term costs.
Disadvantages of ABC
- It is costly to design and use, and the cost may exceed the benefit.
- The analysis may rest on unreliable data and weak assumptions: wrong activities, wrong pools or wrong drivers.
- It analyses historical costs, but decisions should be based on expected future cash flows.
- A large amount of apportionment remains. General costs such as rent, insurance and lighting are apportioned between pools, which weakens the link between driver and cost.
- Systems often have few pools and drivers because more complex systems are hard to justify on cost.
- The best driver for a pool is hard to find, and many activities have more than one.
- Traditional systems may suit inventory valuation and financial reporting better.
The case against traditional costing, and the case for it
Traditional absorption costing is weak in a modern factory because production overhead is high compared with direct cost, so adding it by time spent in production is hard to defend, and because the full production cost it gives has limited value for management decisions.
It remains in use because it is a rational way of charging overhead to give a full cost of production for closing inventory, and because some argue that it helps in pricing.
Which method financial reporting allows
IAS 2 Inventories requires inventory to be measured at the lower of cost and net realisable value, with cost including a systematic allocation of fixed production overhead based on normal capacity, so absorption costing is needed for the financial statements. A traditional rate on normal capacity is the usual method.
An ABC allocation can also be used for reporting if it gives a systematic and reasonable allocation of production overhead and is applied consistently. Marginal costing, which excludes fixed production overhead, is not acceptable for inventory in published statements. Many businesses therefore keep a simple absorption system for the accounts and run ABC separately for management.
Sources and references
- IAS 2 Inventories, on costs of conversion and the allocation of production overheads.
These points are stated as at 6 November 2026.
Comparing the two methods in figures
- Traditional rate = total overhead ÷ total volume of the chosen resource (machine or labour hours).
- Traditional overhead for a product = rate × the hours of the product; per unit = divide by units.
- ABC overhead for a product = Σ (rate for each driver × driver units used), as in the previous topic.
- Compare the overhead per unit, the full cost, the profit per unit and in total, under each method.
- Check that total overhead and total profit are the same under both methods.
Money is in naira, per-unit figures are rounded once to the nearest naira, and totals are exact.
Worked examples
Example 1: the same business under both methods. Use the Ikeja Cables data from the previous topic. Total overhead is ₦16,170,000 and machine hours are 7,000 (P 3,000; Q 2,500; R 1,500). Units: P 6,000, Q 2,500, R 1,000. Direct cost per unit: P ₦1,200 (materials 900 and labour 300), Q ₦1,850, R ₦2,900. Prices: P ₦2,600, Q ₦4,000, R ₦7,500. The ABC overhead per unit was P ₦840, Q ₦2,340 and R ₦5,280. Required: the profit of each product under the traditional method, and the comparison with ABC.
- Traditional rate.
16,170,000 ÷ 7,000 = ₦2,310 per machine hour. - Overhead charged.
P 3,000 × 2,310 = ₦6,930,000, per unit ₦1,155.
Q 2,500 × 2,310 = ₦5,775,000, per unit ₦2,310.
R 1,500 × 2,310 = ₦3,465,000, per unit ₦3,465.
Total 16,170,000. - Full cost.
P 1,200 + 1,155 = ₦2,355.
Q 1,850 + 2,310 = ₦4,160.
R 2,900 + 3,465 = ₦6,365. - Profit per unit.
P 2,600 − 2,355 = ₦245.
Q 4,000 − 4,160 = −₦160.
R 7,500 − 6,365 = ₦1,135. - Total profit.
P 6,000 × 245 = ₦1,470,000; Q −₦400,000; R ₦1,135,000.
Total ₦2,205,000, the same as under ABC. - Comparison. Under ABC the profit per unit was P ₦560, Q −₦190 and R −₦680. The traditional method makes R look the best product at ₦1,135 a unit when it actually causes 40 set-ups, 100 inspections and 180 deliveries for only 1,000 units, and it understates the profit of P, the simple high-volume product. A manager who relied on the traditional figures would push sales of R and might drop P.
Example 2: one pool, volume or driver. Order handling costs ₦4,800,000 a year, and there were 80 orders. Product W: 50,000 units, 10 orders; X: 25,000 units, 20 orders; Y: 15,000 units, 40 orders; Z: 10,000 units, 10 orders. Required: the order handling cost charged to each product on a volume basis and on an ABC basis, and the cost per unit under ABC.
- Volume basis.
4,800,000 ÷ 100,000 units = ₦48 a unit.
W ₦2,400,000; X ₦1,200,000; Y ₦720,000; Z ₦480,000. - ABC rate.
4,800,000 ÷ 80 = ₦60,000 per order. - ABC charge.
W 10 × 60,000 = ₦600,000; X 20 × 60,000 = ₦1,200,000; Y 40 × 60,000 = ₦2,400,000; Z ₦600,000.
Total 4,800,000. - Per unit. W ₦12; X ₦48; Y ₦160; Z ₦60.
- Comment. Y, with a small volume spread over many orders, costs ₦160 a unit to handle and is charged only ₦48 on a volume basis, so W subsidises it.
Expect variants: labour hours instead of machine hours, a different number of pools, an effect on selling price, or a question that asks only for the comparison in words.
Activity based costing in service organisations
Activity based costing suits large service organisations such as banks, hospitals and telecommunications companies.
Their features are:
- overheads are a large share of cost
- there is little direct material and the main cost, labour, is often salaried and fixed in the short term
- services are varied and vary by customer
- overheads are driven by activities such as the number of transactions, customer contacts, complaints handled and compliance checks, not by one volume measure
ABC groups the cost of each activity into a pool, assigns it to services and customers by a driver, and so shows which services and customers are unprofitable, supports pricing and highlights activities that add no value. Regulators may also be interested, because activity costs can show whether tariffs reflect cost.
Difficulties: defining outputs and activities, the cost of collecting data, joint costs that cannot be traced, and resistance from managers.
Problems of ABC in services, and what a regulator looks for
Problems. Facility-sustaining costs (property, for example) may be a large part of cost and avoidable only if the business stops, so there may be no suitable driver; services are intangible, so cost objects are hard to define; many service firms have no earlier costing system, so setting one up is costly; the choice of activities and drivers may be wrong; and the benefits may not justify the cost.
Uses. More accurate service and customer profitability, better pricing, understanding of what causes cost, process improvement and the elimination of non-value-adding activities.
A regulator of a privatised utility or telecommunications firm wants to know:
- the costing method used, to test that prices are fair and the monopoly is not abused
- whether joint and common costs are fairly allocated, so that one service does not cross-subsidise another
- consistency of method between periods, so that changes cannot be used to distort prices
- the return on investment of each service, including the depreciation policy and the allocation of shared assets such as head office
Pricing from a margin or a mark-up
A profit margin is a percentage of the selling price, so price = cost ÷ (1 − margin): cost ₦800 with a 20% margin gives ₦1,000. A mark-up is a percentage of cost: cost ₦800 with a 20% mark-up gives ₦960. Work out the price under each overhead method (traditional and ABC) and compare, as in a question asking for prices under both.
Common mistakes
- Saying ABC changes total profit. It changes only how overhead is spread; the total is the same.
- Calling ABC always better. It costs more and has limits, and the benefit must exceed the cost.
- Comparing only definitions. Compare driver, allocation, accuracy, complexity, focus and use, point against point.
- Ignoring the reporting position. Traditional absorption still serves the financial statements.
- Quoting ABC cost as a short-term relevant cost. Much of it is fixed in the short run.
- Failing to check that overhead charged equals overhead incurred under both methods.
Quick revision
- Traditional: rate = overhead ÷ machine or labour hours; single driver; average; simple; for reporting.
- ABC: several pools and drivers; accurate; complex; for decisions and cost control.
- Same total overhead and profit; different spread between products; high-volume simple products subsidise low-volume complex ones.
- Suitable: high overhead, complex or custom products, varied order sizes.
- Disadvantages: cost, weak assumptions, historical, apportionment remains, driver choice.
- IAS 2 requires absorption costing for inventory; marginal costing is not acceptable for published statements.
How the marks are earned
- Compare: a point for each side of each difference, about one mark per comparison.
- Advantages and disadvantages: one mark per developed point, with a business example.
- Calculate: each rate, each charge and a comparison with the foot check.
- Advise: say which method the business should use for which purpose.
Practice questions
These are original questions, written in the style of the Skills examination. Work each one before you open the answer.
Recall check: multiple choice
Question 1. The traditional method of absorbing overhead uses:
- A rate for each activity
- The number of deliveries
- Several cost pools
- A single volume-based driver such as labour or machine hours
Show the answer
D. It treats all overhead as varying with that one measure.
Question 2. Compared with the traditional method, ABC is generally:
- More accurate but more complex and costly
- Less accurate and simpler
- The same
- Required by law
Show the answer
A. It follows the activities actually used.
Question 3. The traditional overhead absorption rate is:
- Overhead × hours
- Hours ÷ overhead
- Overhead ÷ the volume of the production resource
- Selling price ÷ cost
Show the answer
C. For example ₦ per machine hour.
Question 4. ABC information is most useful for:
- Valuing inventory in published accounts only
- Internal decisions on pricing and product mix
- Calculating tax
- Auditing
Show the answer
B. It shows which products and activities drive cost.
Question 5. A disadvantage of ABC is that it is:
- Costly to design and operate
- Too simple
- Based on no data
- Free
Show the answer
A. The cost may exceed the benefit.
Question 6. A limitation of ABC for decisions is that it analyses:
- Only future costs
- Only revenue
- Historical costs, while decisions need expected future cash flows
- Only taxes
Show the answer
C. Much of the overhead is also fixed in the short run.
Question 7. Traditional absorption costing is still used because it:
- Is more accurate than ABC
- Needs no data
- Is banned for reports
- Gives a full cost of production for closing inventory valuation
Show the answer
D. IAS 2 requires absorption of production overhead.
Question 8. Compared with a volume basis, ABC will usually charge a simple high-volume product:
- More overhead per unit
- Less overhead per unit
- The same overhead per unit
- No overhead
Show the answer
B. It causes less activity per unit.
Question 9. ABC suits a business where:
- Overhead is tiny
- There is one product
- Products are complex or made to customer specification and order sizes differ
- Costs never change
Show the answer
C. Variety makes a single rate misleading.
Question 10. Changing from the traditional method to ABC changes:
- The allocation of overhead between products, but not the total overhead
- The total overhead
- The total sales
- The number of units
Show the answer
A. Total profit is the same under both methods.
Section B style: written questions
Question 11 (10 marks). (a) Compare the traditional method of absorbing overhead with ABC under FOUR headings. (8 marks) (b) State TWO circumstances in which ABC is suitable. (2 marks)
Question 12 (15 marks). A company has overhead of set-ups ₦4,000,000 (80 set-ups), inspections ₦2,400,000 (120 inspections) and machine-related costs ₦6,000,000 (4,000 machine hours). Direct labour hours are 8,000. Product A: 4,000 units, 4,000 labour hours, 1,600 machine hours, 10 set-ups, 20 inspections. Product B: 2,000 units, 2,500 labour hours, 1,400 machine hours, 30 set-ups, 40 inspections. Product C: 1,000 units, 1,500 labour hours, 1,000 machine hours, 40 set-ups, 60 inspections.
(a) Calculate the traditional overhead rate per labour hour. (2 marks) (b) Calculate the overhead charged to each product under the traditional method. (3 marks) (c) Calculate the ABC rate for each pool. (3 marks) (d) Calculate the overhead charged to each product under ABC, and the overhead per unit under each method. (4 marks) (e) Comment on the difference. (3 marks)
Question 13 (20 marks). (a) Discuss the advantages of ABC over traditional absorption costing. (8 marks) (b) Discuss the disadvantages of ABC. (8 marks) (c) Advise whether a manufacturer of made-to-order machines with large overhead should adopt ABC, and for what purpose it should keep the traditional method. (4 marks)
Model answers
Show the model answer to Question 11
(a) Any four headings, 2 marks each (one for each side):
- cost driver, a single driver against multiple drivers
- allocation, on one total against on the activities used
- accuracy, less accurate average against more accurate
- complexity, simple against complex
- focus, simple cost against better information for pricing, product mix and cost control
- use, external reporting against internal analysis
(b) Any two:
- overhead is a large proportion of production cost and direct labour is small
- products are complex
- products are made to customer specification
- order sizes differ and order handling and despatch costs are significant
- absorption costing is needed for inventory valuation (1 each)
Show the model answer to Question 12
(a)
- Total overhead 4,000,000 + 2,400,000 + 6,000,000 = 12,400,000
- ÷ 8,000 = ₦1,550 per labour hour (2).
(b) A 4,000 × 1,550 = ₦6,200,000; B 2,500 × 1,550 = ₦3,875,000; C 1,500 × 1,550 = ₦2,325,000; total 12,400,000 (3).
(c)
- Set-ups 4,000,000 ÷ 80 = ₦50,000
- inspections 2,400,000 ÷ 120 = ₦20,000
- machine 6,000,000 ÷ 4,000 = ₦1,500 per hour (3).
(d)
- ABC.
A 1,600 × 1,500 + 10 × 50,000 + 20 × 20,000 = 2,400,000 + 500,000 + 400,000 = ₦3,300,000; B 2,100,000 + 1,500,000 + 800,000 = ₦4,400,000; C 1,500,000 + 2,000,000 + 1,200,000 = ₦4,700,000; total 12,400,000. - Per unit: traditional A ₦1,550, B ₦1,938, C ₦2,325; ABC A ₦825, B ₦2,200, C ₦4,700 (4).
(e) ABC charges A ₦2,900,000 less than the traditional method, and B ₦525,000 and C ₦2,375,000 more. C, made in small batches with many set-ups and inspections, was under-charged by the labour-hour rate. The total is unchanged. Prices and product decisions based on the traditional costs would mislead (3).
Show the model answer to Question 13
(a) Any four developed points, 2 marks each:
- information about the activities that drive overhead, which traditional methods do not give
- each product charged a fair share of overhead based on activities used
- better information for long-term pricing and product selection
- supports long-term cost control, since all overhead is variable in the long run
- identifies non-value-adding activities and where to improve
- more realistic product profitability, so loss-making products are seen
(b) Any four developed points, 2 marks each:
- costly to design and operate and the cost may exceed the benefit
- rests on unreliable data and assumptions about activities and drivers
- analyses historical costs when decisions need future cash flows
- general overhead such as rent must still be apportioned
- few pools, so averages remain
- the right driver is hard to find
- much cost is fixed in the short run, so dropping a product does not remove it
(c) Adopt ABC for management decisions on pricing, product mix and cost control, because overhead is large and products are made to order and differ in complexity (2). Keep a simple absorption method on normal capacity for the financial statements, as IAS 2 requires, or use ABC for both if it gives a systematic and consistent allocation (2).
Pathfinder on Activity based costing compared with traditional absorption
These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.
ABC v labour-hour rate; expected selling prices; reasons for ABC.
Revise first: Comparing the two methods in figures
ABC with five pools v labour hour rate; prices with 20 percent margin.
Revise first: Comparing the two methods in figures
ABC v labour-hour rate with five pools; expected selling prices; reasons for ABC.
Revise first: Comparing the two methods in figures
ABC in large service organisations: features, problems, uses, regulator interest.
Revise first: Comparing the two methods in figures
Absorption v ABC cost, effect on cost-plus prices and sales with elasticity.
Revise first: Comparing the two methods in figures
ABC v single labour-hour rate, five pools; expected selling prices (a,c in 8/9; b in 33).
Revise first: Comparing the two methods in figures
Source: ICAN Pathfinder, Performance Management. Diets covered: March/July Diet, 2020 to May Diet, 2026. All 13 diets in the Pathfinder are mapped.
Spotted a mistake? Tell us and we will check it.