Sign inSign upSign in
Menu

Relevant Costs for Specific Decisions: Materials, Labour, Equipment and Overheads

ICAN Skills, Performance Management. Syllabus area C: Decision making techniques.

16 min read · Updated 8 November 2026

Download this topic

In this part

A company is asked to quote for a one-off contract. The finance team prices it from the standard cost card: materials at the cost recorded in stock, labour at the standard rate, overhead at the full absorption rate. The price looks fair.

But the stock was bought at last year’s prices and will cost more to replace, the labour is on a fixed wage and is idle half the week. The overhead rate includes costs that will be paid whether the contract is won or not. The standard cost card answers a different question.

The question for a quote is: what is the lowest price at which the contract adds to the company’s cash? This topic shows how to find the relevant cost of materials, labour, equipment and overheads for a decision, using the tests from the previous topic, and how to turn them into a minimum price. It builds on the relevant costs and opportunity cost topic.

The next topic starts cost-volume-profit analysis with break-even and margin of safety.

In 30 seconds

Materials not in stock: relevant cost = purchase cost. Materials in stock and used regularly: relevant cost = replacement cost. Materials in stock but not used regularly: relevant cost = the higher of the net disposal (scrap) value and the benefit of any alternative use. The historical cost of stock is sunk.

Labour: if variable and not scarce, the variable cost; if fixed with spare capacity, zero; if scarce, pay plus lost contribution (or overtime cost, whichever is lower). Equipment: sale value now less sale value after use, if it would otherwise be sold. Overheads: fixed absorption rates are not relevant; variable overhead rates usually are; only extra cash fixed costs count.

The sum of relevant costs is the minimum price. Full marks come from stating the rule applied to each item.

Materials, labour and equipment

Materials

The relevant cost of materials is the additional cash that will be paid, or the benefit lost, by using them for the purpose in question. The historical cost of stock is a sunk cost and is never the relevant cost. The rules are:

  • Not held in stock: the relevant cost is the purchase cost.
  • Held in stock and in regular use: if used for the contract, the stock must be replaced for other work, so the relevant cost is the replacement cost.
  • Held in stock and not in regular use: the relevant cost is the benefit that would be lost by using them: either the net disposal (scrap) value, or the benefit of any alternative use, such as the purchase cost avoided by using them as a substitute. Use the higher.

These are the deprival value of the materials: what the company would lose if it were deprived of them. If only part of the quantity is in stock, apply the rule to the part in stock and add the purchase cost of the rest.

Labour

The relevant cost of labour is the additional cash spent, or saved, as a direct result of the decision.

  • Variable cost, not in short supply (for example part-time staff paid by the hour): the relevant cost is the pay.
  • Fixed cost with spare capacity: the relevant cost is zero. Idle time would be paid for anyway.
  • In limited supply: the relevant cost is the pay plus the contribution lost by moving the labour from its next best use. If the work could instead be done by paying overtime, use the lower of the two alternatives.

Equipment

The book value of equipment is irrelevant. If a machine would be sold if it were not used for the project, the relevant cost is its sale value now less its sale value after the project. If it would be kept in any case, the relevant cost is the fall in its resale value, plus any extra running or repair cost.

Finding the relevant cost of a resourceThree resources. Materials: purchase cost if none in stock, replacement cost if in regular use, scrap or alternative use value if not in regular use. Labour: zero if spare fixed capacity, pay plus lost contribution if scarce. Equipment: sale value now less sale value after use.Materialsnone in stock:purchase costin stock, regular:replacement costin stock, not regular:scrap or alternative useLabourspare fixed capacity:zeroscarce:pay plus lostcontributionor overtime if cheaperEquipmentsale value nowless sale valueafter the projectbook value ignored

Overheads, and turning relevant costs into a price

Overheads follow the same rule: only future cash that the decision changes is relevant.

  • Fixed overhead absorption rate: not relevant. Absorption is not spending, and the cash will be spent whether or not the contract is taken.
  • Variable overhead rate: usually relevant, because it estimates the cash spent on each extra hour worked.
  • Extra fixed costs: relevant if they are extra cash spending caused by the decision (for example supervisor overtime or hire of a machine), or cash saved.

Adding the relevant costs of materials, labour, equipment and overheads gives the minimum price at which the contract does not reduce the company’s cash. The company will usually quote above this, to earn a contribution. The difference between the price and the relevant cost is the cash benefit of the contract.

Points to watch

  • The question may not say whether materials are in regular use. If the stock was bought for the contract, or arises from a decision no longer to use them, treat them as not in regular use. If the company regularly buys them, treat them as in regular use.
  • When labour has spare capacity only for part of the time, apply the zero rule to that part and the scarce rule to the rest.
  • Compare two ways of finding extra labour (overtime or diverting) and choose the cheaper, then say which you chose.
  • Say why each excluded item is excluded: that is where marks are earned.

Layouts

  1. Materials in regular use: quantity × current replacement price.
  2. Materials not in regular use: stock quantity × scrap value per unit (or best alternative) + extra quantity × purchase price.
  3. Scarce labour: hours × (pay per hour + contribution lost per hour) compared with hours × overtime rate; choose the lower.
  4. Spare labour: hours × zero.
  5. Equipment: sale value now − sale value after use.
  6. Variable overhead: hours × variable rate. Extra fixed cash costs: as given.
  7. Minimum price = total of relevant costs.

Money is in naira and answers are exact.

Worked examples

Example 1: materials. A contract needs 3,000 kg of material A and 1,200 kg of material B. Material A is used regularly: the company holds 2,000 kg that cost ₦350 a kg, and the current price is ₦380. Material B is no longer used regularly: it holds 800 kg that cost ₦210,000 and could be scrapped for ₦120,000, and new B costs ₦260 a kg. Required: the relevant cost of materials.

  1. Material A.
    Regular use, so replacement cost: 3,000 × 380 = ₦1,140,000.
    The ₦350 stock cost is sunk.
  2. Material B in stock. Not in regular use, so the scrap value forgone: ₦120,000. The cost of ₦210,000 is sunk.
  3. Material B to be bought.
    1,200 − 800 = 400 kg × 260 = ₦104,000.
    Material B total 120,000 + 104,000 = ₦224,000.
  4. Total relevant cost of materials.
    1,140,000 + 224,000 = ₦1,364,000.

Example 2: labour in three departments. Department 1: 150 hours; fixed wage ₦180 an hour; spare capacity. Department 2: 80 hours; wage ₦260 an hour; full capacity; overtime would cost 150% of the wage, or labour could be diverted from work earning a contribution of ₦90 an hour after pay. Department 3: 200 hours; wage ₦240; scarce; the labour makes product Z, which earns ₦300 contribution a unit and uses 2.5 hours. Required: the relevant cost of labour.

  1. Department 1. Spare capacity: relevant cost zero.
  2. Department 2.
    Overtime: 260 × 150% = ₦390 an hour.
    Diverting: 260 + 90 = ₦350 an hour.
    Divert, as it is cheaper: 80 × 350 = ₦28,000.
  3. Department 3.
    Contribution lost per hour 300 ÷ 2.5 = ₦120.
    Relevant cost per hour 240 + 120 = ₦360.
    200 × 360 = ₦72,000.
  4. Total relevant cost of labour.
    0 + 28,000 + 72,000 = ₦100,000.

Example 3: equipment and overheads. A project would use a machine for six months. It cost ₦180,000 eight years ago, is in the books at ₦30,000, could be sold now for ₦21,000, and after the project would sell for ₦12,000. The project needs 500 labour hours. Variable overhead is ₦45 an hour; fixed overhead is absorbed at ₦60 an hour; supervision overtime of ₦8,000 would be paid only if the project goes ahead. Required: the relevant costs of the machine and overheads.

  1. Machine.
    21,000 − 12,000 = ₦9,000.
    The cost of ₦180,000 and the book value are ignored.
  2. Variable overhead.
    500 × 45 = ₦22,500, a cash cost per hour.
  3. Fixed overhead absorbed.
    500 × 60 = ₦30,000.
    Not relevant.
  4. Supervision overtime. ₦8,000 extra cash, relevant.

Expect variants: a contract priced for a minimum quote, labour partly spare, materials that can be used as a substitute for something else, and a question that asks you to compare the relevant cost with the offered price.

Items that often appear in decision questions

Machine. Depreciation is not a cash flow and is irrelevant. If using the machine lowers its resale value, the fall in resale value is the relevant cost: resale value ₦90,000, falling ₦200 for each 1,000 units; 30,000 units cost 30 × 200 = ₦6,000. Materials with no other use that would otherwise be thrown away at a cost: using them avoids the disposal cost, which is a benefit (20,000 kg, disposal ₦400 per 5,000 kg, avoids ₦1,600); the original cost is sunk.

Materials with an alternative use are charged at what they would save elsewhere (the price of the item they would replace), not at original or replacement cost. Labour already paid and redeployed costs nothing extra, but contract labour or overtime for extra output is relevant.

Salaries and redundancy: a manager’s salary and redundancy pay are relevant if shutting down avoids the salary or causes the redundancy cost; general fixed overheads and apportioned non-production costs are not relevant.

A minimum quotation schedule, and why relevant costing is not enough in the long term

Example. A contract needs 800 kg of Material Y (300 kg in stock bought at ₦400; regular use; replacement cost ₦450; resale value ₦250), 300 hours of workers on a guaranteed wage with spare capacity, 60 hours of engineers, a machine for 7 weeks, a specially developed component and 400 kg of another material costing ₦400,000. The engineers are at full capacity: overtime costs ₦4,000 an hour, or they could leave a product that earns ₦90,000 per 20 hours.

The machine hire already paid has 3 weeks left; another block of 10 weeks costs ₦900,000, or a machine can be bought for ₦9m and sold for ₦8m. The component cost ₦2m to make and its use means missing an exhibition (fee for non-attendance ₦100,000) but the sales it would have won can still be made.

  • Material Y:
    in regular use, so valued at replacement cost: 800 × 450 = ₦360,000 (the original cost is sunk; resale value is irrelevant).
  • Workers: paid anyway: nil.
  • Engineers:
    overtime 60 × 4,000 = ₦240,000, against lost contribution 3 units × 90,000 = ₦270,000: take the lower, ₦240,000.
  • Machine: rent block ₦900,000, against buy and sell ₦1,000,000: take ₦900,000 (the first payment is sunk).
  • Component: cost is sunk; the relevant cost is the fee ₦100,000; the chief executive’s salary and time are not relevant.
  • Other material: ₦400,000.
  • Excluded: hospitality already spent (sunk), absorbed fixed overhead and the normal mark-up.

Minimum price = 360,000 + 240,000 + 900,000 + 100,000 + 400,000 = ₦2,000,000. This price gives no profit and no contribution to fixed costs, so it is not sustainable in the long term, when the business needs to cover all costs, earn the return that investors expect and consider market conditions. It is suited to a one-off order to enter a market.

Mutually exclusive contracts, and why relevant-cost and routine job-cost results differ

For two contracts of which only one can be done, list for each the incremental revenue and savings (including the sale or alternative use of materials released and the penalty for cancelling the other) and the incremental costs, and choose the higher net figure. Example (₦m). Delta: price 9.0; Echo: price 10.0. Choosing Delta releases Echo’s materials (held 0.8, contracted 1.4), which could replace material normally costing 20% less on another job: saving 80% × 2.2 = 1.76.

Choosing Echo lets Delta’s stock be sold for 1.2. Materials already contracted for must be paid whichever is chosen, so are not incremental. Delta: materials to buy 1.5, labour 3.0, penalty for cancelling Echo 0.5. Echo: materials to buy 1.0, labour 2.4, penalty for cancelling Delta 0.9. Delta: 9.0 + 1.76 − (1.5 + 3.0 + 0.5) = 5.76. Echo: 10.0 + 1.2 − (1.0 + 2.4 + 0.9) = 6.90. Take Echo, by 1.14m. Fixed salaries, head office costs and notional interest are left out.

Also consider: the reliability of the estimates (the difference is small, so test sensitivity), whether the alternative use of materials will really arise, goodwill and future contracts, and whether the constraints that make the contracts exclusive can be overcome.

Relevant-cost profit against routine job-cost profit. A job-costing report shows a different result because it charges:

  • labour that is paid anyway (idle time) that is not incremental
  • materials at book value, not replacement cost or realisable value
  • a share of fixed overhead that would be incurred anyway (and at a recalculated absorption rate)
  • it ignores contribution lost on other products and fixed costs avoided

A contract can show a loss in the job-cost report yet add to profit on a relevant-cost basis, so the decision should use relevant costs.

More items from a contract estimate

Material in stock with no alternative use (book value ₦50,000, replacement price ₦90,000, scrap value ₦30,000): the relevant cost is the scrap value forgone, ₦30,000. Material bought in bulk when only 70% will be used and the rest has no use: the relevant cost is the whole bulk price (₦80,000), not 70% of it.

Skilled labour in short supply working at weekends: the premium (30% above the normal rate) is incremental, and the normal-rate cost is relevant if the hours must be bought or other work given up. Idle unskilled labour: only the incremental pay is relevant (for instance, time off in lieu for weekend hours). Equipment rented out when not used: the relevant cost is the contribution lost, not the rent.

Non-monetary factors before accepting: publicity and goodwill, future work from the client, effect on existing customers and capacity, staff morale from overtime, and the standing of a public-sector client.

Hire or buy a machine, recruit or replace labour, and why reported profit differs

Machine. Compare hiring with buying and then renting out the idle time. Hire: 10 weeks × ₦40,000 = ₦400,000. Buy: cost ₦2.5m less resale ₦1.5m = ₦1.0m, less rental income 30 weeks × ₦25,000 = ₦0.75m, net ₦250,000: take the lower, ₦250,000. Running costs of the weeks used are relevant; depreciation is not. Skilled labour. Recruiting costs ₦120 an hour; transferring existing staff costs nothing extra in pay (they are paid anyway) but their replacement on the old work costs ₦110: take the lower, ₦110.

Supervisor: salary and unpaid overtime are not incremental; a bonus paid only if the project goes ahead is relevant. Material part in stock: the stock is charged at resale value (5,000 × ₦20 = ₦100,000) and the remainder at current purchase price (5,000 × ₦50 = ₦250,000).

Why the year-end profit report differs from the profit built into the quotation: it includes depreciation and absorbed overheads, charges materials at inventory valuation rather than relevant cost, and charges staff for their time on the project. Why contribution is the basis: decisions change activity, and the relevant items are those that change with it.

Opportunity cost matters because resources are scarce, so each use must be compared with the best alternative forgone, especially when several resources are scarce at once.

Common mistakes

  • Using the stock record cost. It is sunk. Use replacement or scrap value.
  • Charging spare fixed labour. It costs nothing extra.
  • Forgetting lost contribution when labour is scarce.
  • Adding the absorbed fixed overhead. It is not cash caused by the decision.
  • Using book value for the machine. Use the sale values.
  • Not choosing the cheaper way to find labour. Compare overtime with diversion.

Quick revision

  • Materials: not in stock, purchase; in stock regular, replacement; in stock not regular, scrap or alternative use.
  • Labour: spare, zero; scarce, pay plus lost contribution or overtime if cheaper.
  • Equipment: sale value now less sale value after use.
  • Overhead: fixed absorption not relevant; variable rate relevant; extra fixed cash relevant.
  • Minimum price = sum of relevant costs.

How the marks are earned

  • Calculate: a mark for each resource, with the right rule and the figure.
  • Explain exclusions: a mark for each item left out, with the reason.
  • Advise: compare the price with the relevant cost and state the decision.

Practice questions

These are original questions, written in the style of the Skills examination. Work each one before you open the answer.

Recall check: multiple choice

Question 1. If materials are not held in stock, their relevant cost is:

  1. Last year’s price
  2. Zero
  3. The selling price
  4. The purchase cost
Show the answer

D. It is the cash that must be paid.

Question 2. Materials in stock that are in regular use have a relevant cost equal to their:

  1. Original cost
  2. Replacement cost
  3. Book value
  4. Zero
Show the answer

B. They will have to be replaced for other work.

Question 3. Materials in stock that are not in regular use and have no other use have a relevant cost equal to their:

  1. Net disposal (scrap) value
  2. Original cost
  3. Replacement cost
  4. Zero always
Show the answer

A. That is the benefit forgone by using them.

Question 4. Fixed-wage labour with spare capacity has a relevant cost of:

  1. Full pay
  2. Overtime pay
  3. Zero
  4. Double pay
Show the answer

C. Idle time would be paid anyway.

Question 5. Scarce labour has a relevant cost of:

  1. Zero
  2. Pay plus the contribution lost
  3. Contribution only
  4. Overhead only
Show the answer

B. Or overtime cost if cheaper.

Question 6. A fixed overhead absorption rate is:

  1. Not relevant, because absorption is not cash spending
  2. Always relevant
  3. An opportunity cost
  4. A sunk revenue
Show the answer

A. Unless the decision changes spending.

Question 7. A variable overhead rate is usually:

  1. Ignored
  2. Sunk
  3. Committed
  4. Relevant, as the cash spent on each extra hour
Show the answer

D. It estimates extra cash spending.

Question 8. The historical cost of materials in stock is:

  1. Always relevant
  2. The replacement cost
  3. A sunk cost
  4. Opportunity revenue
Show the answer

C. It was spent in the past.

Question 9. The deprival value of an item is:

  1. Its cost
  2. Its tax value
  3. The benefit lost if the company were deprived of it
  4. Its book value
Show the answer

C. It is the relevant cost of materials in stock.

Question 10. A machine that would be sold now but is used on a project and sold later has a relevant cost of:

  1. Sale value now less sale value after use
  2. Its book value
  3. Its original cost
  4. Zero
Show the answer

A. The fall in sale value is the cost of using it.

Section B style: written questions

Question 11 (10 marks). (a) State the relevant cost of materials under the three stock situations. (6 marks) (b) State the relevant cost of labour in three situations. (4 marks)

Question 12 (15 marks). A contract needs 2,500 kg of material P, 900 kg of material Q and 400 hours of labour. Material P is used regularly: 1,800 kg are held at a cost of ₦410, and the replacement price is ₦450. Material Q is not in regular use: 600 kg are held, originally costing ₦95,000, with a scrap value of ₦48,000; new Q costs ₦140 a kg.

Labour is paid ₦200 an hour on a fixed wage; 150 hours are spare; the other hours could be overtime at 150% of pay or diverted from work earning ₦60 contribution an hour after pay. Supervision overtime of ₦120,000 would be incurred for the contract.

(a) Calculate the relevant cost of materials. (7 marks) (b) Calculate the relevant cost of labour. (5 marks) (c) Calculate the minimum price for the contract. (3 marks)

Question 13 (20 marks). A contract would use a machine that cost ₦180,000 eight years ago and is in the books at ₦30,000. It could be sold now for ₦21,000 or after the contract for ₦12,000. The contract needs 1,200 labour hours at ₦18 an hour, fixed wage; 450 hours are spare; for the rest, overtime would cost 150% of pay, or labour could be diverted from work earning ₦6 an hour contribution after pay.

Variable overhead is ₦12 an hour of labour and fixed overhead is absorbed at ₦48 an hour. The price offered is ₦55,000.

(a) Calculate the relevant cost of the machine. (3 marks) (b) Calculate the relevant cost of labour. (5 marks) (c) Calculate the relevant cost of overhead and explain your treatment of the fixed overhead rate. (4 marks) (d) Calculate the total relevant cost and advise whether to accept the price. (4 marks) (e) Explain the rule for materials held in stock. (4 marks)

Model answers

Show the model answer to Question 11

(a) Not in stock: purchase cost (2). In stock and in regular use: replacement cost, because the stock must be replaced for other work (2). In stock and not in regular use: the higher of net disposal value and the benefit of an alternative use (2).

(b) Variable and not scarce: the variable pay (1). Fixed with spare capacity: zero (1). Scarce: pay plus the contribution lost (1), or the overtime cost if lower (1).

Show the model answer to Question 12

(a)

  1. P: regular use, replacement cost 2,500 × 450 = ₦1,125,000 (3).
  2. Q: stock 600 kg at scrap value 48,000 (2), plus 300 kg bought at 140 = 42,000 (1); total ₦90,000 (1).
  3. Total materials 1,125,000 + 90,000 = ₦1,215,000.

(b)

  1. Spare 150 hours: zero (1).
  2. The other 250 hours: overtime 200 × 1.5 = ₦300; diverting 200 + 60 = ₦260; divert (2).
  3. 250 × 260 = ₦65,000 (2).

(c) Materials 1,215,000 + labour 65,000 + supervision 120,000 = ₦1,400,000 minimum price (3).

Show the model answer to Question 13

(a) 21,000 − 12,000 = ₦9,000 (3).

(b)

  1. Spare 450 hours: zero (1).
  2. Remaining 750 hours: overtime 18 × 1.5 = ₦27; diverting 18 + 6 = ₦24; diverting is cheaper (2).
  3. 750 × 24 = ₦18,000 (2).

(c)

  1. Variable overhead 1,200 × 12 = ₦14,400 (2).
  2. The fixed overhead rate of ₦48 an hour is not relevant because absorption is not extra cash spending and the cost is incurred whatever is decided (2).

(d)

  1. Total relevant cost 9,000 + 18,000 + 14,400 = ₦41,400.
  2. The price of ₦55,000 gives a cash benefit of ₦13,600, so accept (4).

(e) The historical cost of stock is sunk. If the material is in regular use, the relevant cost is the replacement cost; if not, it is the scrap value or the benefit of an alternative use. Any extra quantity is valued at purchase cost (4).

Pathfinder on Relevant costs for specific decisions

These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.

May Diet, 2025: Question 1 (30 marks)

Relevant cost of a one-year engineering project (hire v buy machine, labour, materials); why reported profit differs; contribution theory; opportunity cost.

Revise first: Layouts

November Diet, 2024: Question 4 (20 marks)

Relevant cost estimate for painting contract and non-monetary factors.

Revise first: Layouts

May Diet, 2023: Question 3 (20 marks)

Relevant revenue and cost of a contract (labour grade 1 idle, replacement cost, NRV, lost contribution of Y); job-cost report; reconcile relevant and routine figures.

Revise first: Layouts

May Diet, 2023: Question 4 (20 marks)

Choose between two mutually exclusive contracts using incremental revenues and costs (Abuja, Lagos).

Revise first: Layouts

May Diet, 2023: Question 7 (15 marks)

Learning rate from batch times, time for 400 more units, minimum price with opportunity cost of scarce labour.

Revise first: Layouts

November Diet, 2022: Question 1 (30 marks)

Relevant cost schedule for a contract (nine items); limits of relevant costing; skimming launch price.

Revise first: Layouts

May Diet, 2022: Question 1 (30 marks)

Product contribution/profit, drop a product, extra sales to cover advertising; relevant cost quote for a one-off job; incremental, differential, committed, sunk, opportunity cost.

Revise first: Layouts

November Diet, 2021: Question 2 (20 marks)

Make or buy with discounting, indifference price, non-financial factors.

Revise first: Layouts

November Diet, 2020: Question 1 (40 marks)

Relevant costs: reduce output, shut down, special order; techniques and principles.

Revise first: Layouts

March/July Diet, 2020: Question 1 (40 marks)

Single limiting factors for two components, spare capacity outlets, ways to overcome constraints, opportunity cost of material/labour/overhead.

Revise first: Layouts

Source: ICAN Pathfinder, Performance Management. Diets covered: March/July Diet, 2020 to May Diet, 2026. All 13 diets in the Pathfinder are mapped.

Spotted a mistake? Tell us and we will check it.

Where this fits

See every past question on Performance Management and the topic each one tests in the Pathfinder question finder.

This course builds on Management Accounting. After it, move on to Strategic Financial Management.

All Performance Management topics

You are reading topic 18 of 77.

  1. Information systems in organisations: role, costs and benefits01
  2. Internet, intranet, wireless technology and networks in business02
  3. Information needs at strategic, tactical and operational levels03
  4. TPS, MIS, EIS, ERP and CRM systems compared04
  5. Social and ethical issues in strategy and the management accountant’s data role05
  6. Big data principles and the big data pyramid06
  7. Big data, data mining and analytics: uses, benefits, challenges and risks07
  8. Activity based costing: cost pools, cost drivers and calculations08
  9. Activity based costing compared with traditional absorption costing09
  10. Target costing: principles and calculating the target cost10
  11. Managing the target cost gap and target costing in services11
  12. Life cycle costing: product life cycle stages and costs12
  13. Life cycle cost and profit calculations, and the benefits of life cycle costing13
  14. Throughput accounting: theory of constraints and the throughput accounting ratio14
  15. Environmental management accounting and sustainability in business15
  16. Environmental costs: methods, challenges and the management accountant’s role16
  17. Relevant costs and revenues, and opportunity cost17
  18. Relevant costs for specific decisions: materials, labour, equipment and overheads18 here
  19. Break-even analysis and margin of safety for Skills level decisions19
  20. Contribution to sales ratio, target profit and target revenue20
  21. Break-even charts and profit-volume charts21
  22. Multi-product CVP analysis and its limitations22
  23. Limiting factors: allocating a single scarce resource23
  24. Linear programming: formulation and graphical solution24
  25. Linear programming: slack and shadow prices25
  26. Price elasticity of demand and the factors that influence price26
  27. Demand and cost functions: profit-maximising price and output27
  28. Cost-based pricing: cost-plus and relevant-cost pricing28
  29. Market-based pricing: skimming, penetration and other strategies29
  30. Make-or-buy and outsourcing decisions30
  31. One-off contracts, shutdown and further processing of joint products31
  32. Reducing uncertainty: research, simulation and sensitivity analysis32
  33. Expected values and decision rules: maximax, maximin and minimax regret33
  34. Decision trees for multi-stage decisions34
  35. Value of perfect and imperfect information35
  36. Budgetary systems and types of budget: choosing the right one36
  37. Preparing fixed and flexed budgets37
  38. Rolling, activity-based, functional and master budgets38
  39. The beyond budgeting model: benefits and problems39
  40. Participation, negotiation and ethics in budgeting40
  41. High-low method and cost estimation for budgets41
  42. Correlation, regression and time series for budgeting and forecasting42
  43. Learning curve: learning rate and learning effect43
  44. Learning curve in budgeting: steady state and limitations44
  45. Standard costing: uses, how standards are set and types of standard45
  46. Basic variances: material, labour and idle time46
  47. Material mix and yield variances47
  48. Labour mix and yield variances48
  49. Sales mix and quantity variances49
  50. Planning and operational variances: revised budget, sales, market size and market share50
  51. Planning and operational variances for materials and labour51
  52. Overhead variances and reconciling budgeted and actual profit at Skills level52
  53. Behavioural effects of variances: motivation, JIT and TQM53
  54. Profitability ratios and financial performance measures54
  55. Liquidity, solvency and efficiency ratios55
  56. Non-financial performance indicators56
  57. Short-termism and financial manipulation of results57
  58. Sustainability and ESG performance measures58
  59. The balanced scorecard59
  60. The Fitzgerald and Moon building block model60
  61. Performance measurement in not-for-profit organisations61
  62. Value for money as a public sector objective62
  63. Divisional performance: return on investment and residual income63
  64. Economic value added (EVA)64
  65. Transfer pricing methods and the optimal transfer price65
  66. Transfer pricing: problems, tax and repatriation of funds66
  67. Value chain analysis for performance management67
  68. Complex business structures: alliances, joint ventures and supply chains68
  69. The performance pyramid69
  70. Value-based management70
  71. Corporate failure and life cycle issues71
  72. The Z-score and other quantitative failure models72
  73. The Argenti model and qualitative failure prediction73
  74. Preventing corporate failure and performance improvement strategies74
  75. Current developments in management accounting75
  76. Benchmarking and target setting in the public sector76
  77. The changing role of the management accountant and contemporary issues77
See the whole course

Get the complete Performance Management notes

Download as PDF or Word

  • Every topic as PDF and Word, ready to print
  • Edit it in Word or print the PDF. No retyping.
Get this course

Reading stays free. Access lasts 12 months. Pay by card, bank transfer, USSD or QR through Paystack. Your name and email appear on every page of your files. Read our Refund Policy.

PracticeNext topic