Sign inSign upSign in
Menu

Preparing Fixed and Flexed Budgets and Analysing Variances Between Them

ICAN Skills, Performance Management. Syllabus area D: Budgeting and control.

12 min read · Updated 8 November 2026

Download this topic

In this part

In January a company in Port Harcourt budgets to make and sell 10,000 units. By December it has sold 11,200, spent more in total than the budget allowed, and earned more profit than planned. Was the performance good?

A simple comparison of actual and budget says costs are adverse and profit is favourable. But it cannot say how much of the difference is due to the extra volume, which was welcome, and how much is due to prices and efficiency, which management controls. To answer that, the budget has to be restated at the level of activity actually achieved.

This is the flexed budget. This topic explains the fixed (static) budget and the steps for preparing it, how to prepare a flexed budget from the cost behaviour of each item, how to separate semi-variable costs, and how to compare actual results with the fixed and the flexed budgets so that the profit variance splits into a volume element and a spending element.

It builds on the earlier topic on budgetary systems and types of budget. The next topic covers rolling, activity based, functional and master budgets.

In 30 seconds

A fixed (static) budget is prepared in advance for one expected level of activity and is not changed when activity differs. A flexed (flexible) budget is restated for the actual level of activity.

To flex:

  • (1) separate costs into fixed, variable and semi-variable (split semi-variable costs, for example by the high-low method)
  • (2) calculate the variable cost per unit
  • (3) write the flexed budget formula, total cost = fixed cost + variable cost per unit × units
  • (4) apply it at the activity level required

Fixed costs stay unchanged within the relevant range; variable costs change in proportion; revenue changes with units sold.

To control performance, compare actual with the flexed budget, because both are at the same activity, so the differences are due to price and efficiency. The sales volume variance (profit) is flexed budget profit minus fixed budget profit; the spending variance is actual profit minus flexed budget profit. Full marks come from the cost classification, the flexing and a clear split of the variance.

Fixed and flexed budgets

The fixed (static) budget

A fixed budget is prepared in advance for a stated period at a planned level of activity, and it does not change when actual activity differs from plan. It is built using historical analysis, top-down or bottom-up approaches, zero-based budgeting or activity based budgeting.

The steps are: define the period; set the goals and targets; estimate revenue and expenses; allocate the expenses to responsible centres; monitor actual performance; and review and revise as needed. It is used for sales, production, overhead, personnel, capital expenditure and marketing budgets.

Advantages: useful for planning and for setting goals and targets; it is simple; it supports control and accountability and gives a source of motivation and an overall financial plan against which to authorise spending.

Disadvantages: it is inflexible, because the figures do not change with activity; it can set unrealistic goals when conditions change; and above all, when actual volume differs from budget, a comparison of actual with the fixed budget mixes the effect of volume with the effects of price and efficiency, which makes it a poor basis for judging managers.

The flexed (flexible) budget

A flexed budget is a budget restated for a different level of activity, normally the actual level. It recognises that costs behave differently when activity changes. The steps are:

  1. Identify fixed and variable costs. Variable costs change in total in proportion to activity; fixed costs stay the same in total within the relevant range; semi-variable (mixed) costs have both elements.
  2. Separate semi-variable costs into fixed and variable parts, for example by the high-low method: variable cost per unit = change in cost ÷ change in activity; fixed cost = total cost − variable cost per unit × activity.
  3. Calculate the variable cost per unit for each variable item.
  4. Write the flexed budget formula: total cost = total fixed cost + (variable cost per unit × activity).
  5. Apply it to the required activity level, flexing revenue (price × units sold) as well as costs.

Benefits: better cost control, since actual costs are compared with what they should have been at the actual activity; fairer performance evaluation; the ability to plan for different scenarios (what if volume is 10% higher); and better resource allocation.

Limits: it depends on reliable splits between fixed and variable costs; fixed costs and unit variable costs are not constant over very wide ranges (the relevant range) or when costs are stepped; and the activity measure chosen must really drive the cost.

Fixed budget and flexed budgetA graph of total cost against activity. A horizontal line shows the fixed budget at one level. A rising line starting above zero shows the flexed budget, which equals the fixed budget at the planned activity and is higher at the actual activity. Vertical marks show the planned and actual levels.flexed budgetfixed budgetplannedactualcostactivity

Using the two budgets together

Three sets of figures are needed: the fixed budget (planned activity), the flexed budget (actual activity at budgeted prices and costs) and the actual results. The differences between them have different meanings.

  • Fixed budget profit → flexed budget profit is the sales volume variance (in profit terms): the effect of selling a different number of units than planned, at budgeted margins. It is favourable when more are sold at a positive contribution.
  • Flexed budget → actual is the spending (or price and efficiency) variance: the effect of actual prices, costs and efficiency being different from budget at the same level of activity. This is the part that managers can be held responsible for.
  • The two add to the total difference between actual and fixed budget profit.

Line by line, revenue is compared with revenue (a difference reflects selling price), each variable cost with the flexed figure (a difference reflects price or usage of the resource) and fixed costs with the fixed budget (a difference reflects spending). The detailed variances (material price and usage, labour rate and efficiency, and so on) are the subject of the later topics on standard costing.

Flexing is needed because a fixed budget does not allow for the fact that costs rise with volume. A manager who sold more than budgeted will certainly spend more on materials; the question is whether the spending was more than it should have been for that volume. Only a flexed budget answers it.

Flexible and flexed budgets are not the same, and budgeting under uncertainty

A fixed annual budget is unsatisfactory because, when it is prepared, there is a great deal of uncertainty and it rests on estimates that may turn out wrong; and because unexpected events during the year may make it unrealistic.

Risk and uncertainty mean that forecasts in a budget are unlikely to be exactly right, so managers should look at several forecasts when preparing budgets and, when monitoring results, remember that a variance may come from a weak forecast rather than from good or bad performance. Approaches include flexible budgets, probabilities and expected values, feed-forward control, spreadsheet “what if” analysis and stress testing.

A flexible budget is prepared before the period (ex ante) for different volumes of output and sales from the master budget: for example a master budget on sales of ₦100 million, with flexible budgets at ₦80 million, ₦90 million, ₦110 million and ₦120 million, each allowing for changes in fixed cost above or below some level of sales and for changes in unit variable cost at some volume.

If actual activity is far from the plan, a suitable flexible budget can replace the fixed one. Its disadvantage is the time and effort of preparing them, which may cost more than the information is worth. A flexed budget is prepared after the period (ex post): the budget redrafted to the actual level of activity, for control and variance analysis, as above.

Expected values can be used in a sales budget.

If sales will be ₦40m with probability 0.6, ₦50m with 0.3 and ₦70m with 0.1, the expected value is 24 + 15 + 7 = ₦46m. But that figure is not one of the possible outcomes, and sales for a year happen only once, so it may be more sensible to base the fixed budget on the most likely outcome (₦40m) and prepare flexible budgets for ₦50m and ₦70m. Expected values are best where the event happens many times in the period, and probabilities should have a rational basis.

With a spreadsheet model, a new budget can be produced by changing a few inputs, allowing “what if” questions: sales 5% below forecast, a different product mix, a six-month delay in a new system, interest rates 2% higher than expected. Sensitivity analysis uses variations that are reasonably likely (costs up 5%, sales down 5%); stress testing uses much larger changes (sales 20% below forecast, a key material 50% dearer) to see how far results could fall.

Layouts for flexed budgets and variance analysis

  1. Cost classification and rates. Variable per unit; fixed total; split mixed costs by high-low.
  2. Flexed budget. Revenue = price × actual units. Variable costs = rate × actual units. Fixed costs as budgeted.
  3. Three columns. Fixed budget; flexed budget; actual.
  4. Variances. Volume = flexed − fixed profit. Spending = actual − flexed profit, by line.
  5. Label each as favourable (F) or adverse (A).

Money is in naira and each answer is rounded once, at the end.

Worked examples

Example 1: preparing a flexed budget. The budget for 10,000 units is: materials ₦1,500,000; direct labour ₦1,200,000 (variable); variable production overhead ₦400,000; fixed production overhead ₦900,000; administration ₦250,000 (fixed). Selling expenses are semi-variable: ₦300,000 at 10,000 units and ₦380,000 at 14,000 units. Required: the flexed budget at 8,000 and 12,000 units.

  1. Variable cost per unit. Materials 150; labour 120; variable overhead 40.
  2. Selling expenses.
    Variable per unit = (380,000 − 300,000) ÷ (14,000 − 10,000) = 80,000 ÷ 4,000 = ₦20.
    Fixed = 300,000 − 20 × 10,000 = ₦100,000.
  3. Totals.
    Variable cost per unit 150 + 120 + 40 + 20 = ₦330.
    Fixed costs 900,000 + 250,000 + 100,000 = ₦1,250,000.
  4. Flexed budget.
    At 10,000 units: 3,300,000 + 1,250,000 = ₦4,550,000.
    At 8,000 units: 2,640,000 + 1,250,000 = ₦3,890,000.
    At 12,000 units: 3,960,000 + 1,250,000 = ₦5,210,000.
  5. Check. A 20% fall in volume reduces total cost by only 14.5% (4,550 to 3,890), because the fixed costs do not fall.

Example 2: fixed, flexed and actual. Using the budget above, the selling price is ₦500. The company sold 11,200 units at ₦495 and incurred total costs of ₦4,990,000. Required: the volume and spending variances on profit.

  1. Fixed budget profit.
    Revenue 10,000 × 500 = 5,000,000; costs 4,550,000; profit ₦450,000.
  2. Flexed budget profit at 11,200 units.
    Revenue 11,200 × 500 = 5,600,000; costs 330 × 11,200 + 1,250,000 = 3,696,000 + 1,250,000 = 4,946,000; profit ₦654,000.
  3. Actual profit.
    Revenue 11,200 × 495 = 5,544,000; costs 4,990,000; profit ₦554,000.
  4. Sales volume variance.
    654,000 − 450,000 = ₦204,000 F.
  5. Spending variance.
    554,000 − 654,000 = ₦100,000 A.
    Of this, revenue is ₦56,000 A (5,544,000 − 5,600,000, the price cut of ₦5 on 11,200 units) and costs are ₦44,000 A (4,990,000 − 4,946,000).
  6. Total.
    204,000 F − 100,000 A = ₦104,000 F, which equals actual profit less fixed budget profit (554,000 − 450,000).
    The comparison with the fixed budget alone would have praised the manager for a ₦104,000 improvement.
    The flexed budget shows that the extra volume was worth ₦204,000 and that spending and pricing lost ₦100,000.

Expect variants: a stepped cost in the range, flexing at more than one level, an incomplete budget that must be completed from percentages, or a question that asks which budget should be used to judge a manager and why.

Common mistakes

  • Flexing fixed costs. They stay as budgeted within the relevant range.
  • Flexing using the wrong activity. Use units sold for revenue and units produced for production costs.
  • Comparing actual with the fixed budget and calling the difference a spending variance.
  • Leaving semi-variable costs unsplit.
  • Using budgeted price on actual revenue in the flexed column, but actual price in the actual column.
  • No F or A labels.

Quick revision

  • Fixed budget: one activity level, not changed. Flexed: restated at actual activity.
  • Flex = fixed cost + variable per unit × units; split mixed costs (high-low).
  • Volume variance = flexed − fixed profit; spending variance = actual − flexed profit.
  • Judge managers against the flexed budget.

How the marks are earned

  • Classify costs and calculate rates.
  • Flex each line correctly.
  • Analyse the variance and comment on the right basis for judging performance.

Practice questions

These are original questions, written in the style of the Skills examination. Work each one before you open the answer.

Recall check: multiple choice

Question 1. A fixed budget is:

  1. Adjusted monthly
  2. Restated for actual activity
  3. Not adjusted for the actual level of activity
  4. Made of fixed costs only
Show the answer

C. It stays as approved.

Question 2. A flexed budget is:

  1. The budget restated at the actual level of activity
  2. Always lower than the fixed budget
  3. Made only of variable costs
  4. A cash budget
Show the answer

A. It allows a fair comparison.

Question 3. To flex a budget you must first:

  1. Raise prices
  2. Remove fixed costs
  3. Ignore overheads
  4. Separate fixed and variable costs
Show the answer

D. Semi-variable costs must also be split.

Question 4. In a flexed budget, fixed costs:

  1. Rise with volume
  2. Stay the same within the relevant range
  3. Fall with volume
  4. Are removed
Show the answer

B. They are fixed in total.

Question 5. Variable cost per unit in flexing is assumed to be:

  1. Constant
  2. Falling
  3. Rising
  4. Zero
Show the answer

A. Total variable cost changes in proportion.

Question 6. Comparing the fixed and flexed budgets isolates the effect of:

  1. Price
  2. Efficiency
  3. Volume
  4. Inflation
Show the answer

C. The sales volume variance.

Question 7. The sales volume variance in profit terms is:

  1. Actual profit less flexed profit
  2. Flexed budget profit less fixed budget profit
  3. Fixed profit less actual profit
  4. Revenue less cost
Show the answer

B. It is the effect of volume at budgeted margins.

Question 8. A semi-variable cost can be split by:

  1. Ignoring it
  2. Doubling it
  3. Halving it
  4. The high-low method
Show the answer

D. Regression is another method.

Question 9. To judge a manager’s efficiency, compare actual results with the:

  1. Flexed budget
  2. Fixed budget
  3. Prior year
  4. Cash budget
Show the answer

A. Both are at the same activity.

Question 10. A disadvantage of a fixed budget is that it:

  1. Is too detailed
  2. Has no targets
  3. Is inflexible when activity differs from plan
  4. Is too accurate
Show the answer

C. Comparisons then mix volume with performance.

Section B style: written questions

Question 11 (10 marks). (a) Distinguish between a fixed budget and a flexed budget. (4 marks) (b) State the steps in preparing a flexed budget. (4 marks) (c) State TWO limits of flexing. (2 marks)

Question 12 (15 marks). The budget for 5,000 units is: materials ₦750,000; direct labour ₦500,000 (variable); variable overhead ₦150,000; fixed overhead ₦400,000. Maintenance is semi-variable: ₦120,000 at 5,000 units and ₦160,000 at 7,000 units.

(a) Calculate the variable cost per unit of each variable item and the split of maintenance. (5 marks) (b) Prepare the flexed budget for 6,000 units. (5 marks) (c) State THREE benefits of flexed budgets. (3 marks) (d) Explain why a fixed budget is unsuitable for control. (2 marks)

Question 13 (20 marks). The fixed budget is for 4,000 units at ₦800, a variable cost of ₦500 a unit and fixed costs of ₦700,000. Actual: 4,600 units sold at ₦790, variable costs ₦2,410,000 and fixed costs ₦740,000.

(a) Prepare the flexed budget at 4,600 units. (6 marks) (b) Calculate the fixed budget, flexed budget and actual profits, and the sales volume and spending variances, with a breakdown of the spending variance. (10 marks) (c) Comment on the performance. (4 marks)

Model answers

Show the model answer to Question 11

(a) A fixed budget is prepared for one planned activity level and is not changed when activity differs (2). A flexed budget is restated for a different, usually the actual, level of activity, taking account of cost behaviour (2).

(b) Identify fixed and variable costs; separate semi-variable costs; calculate variable cost per unit; write the formula fixed + variable per unit × activity; apply it at the required activity level (4).

(c) Any two: depends on reliable cost splits; costs are not constant outside the relevant range; stepped costs; the activity measure may not drive the cost (1 each).

Show the model answer to Question 12

(a)

  1. Materials 750,000 ÷ 5,000 = ₦150; labour ₦100; variable overhead ₦30.
  2. Maintenance variable (160,000 − 120,000) ÷ (7,000 − 5,000) = ₦20 a unit
  3. fixed 120,000 − 20 × 5,000 = ₦20,000 (5).

(b)

  1. Variable cost per unit 150 + 100 + 30 + 20 = 300
  2. × 6,000 = 1,800,000.
  3. Fixed 400,000 + 20,000 = 420,000.
  4. Total ₦2,220,000 (5).

(c) Any three: better cost control; fairer performance evaluation; scenario planning; better resource allocation (3).

(d) It does not change with activity, so a comparison with actual mixes the effect of volume with the effects of price and efficiency (2).

Show the model answer to Question 13

(a) Revenue 4,600 × 800 = 3,680,000; variable costs 4,600 × 500 = 2,300,000; fixed 700,000; profit ₦680,000 (6).

(b)

  1. Fixed budget.
    3,200,000 − 2,000,000 − 700,000 = ₦500,000.
  2. Actual.
    revenue 4,600 × 790 = 3,634,000
  3. less 2,410,000 and 740,000 = ₦484,000.
  4. Sales volume variance 680,000 − 500,000 = ₦180,000 F.
  5. Spending variance 484,000 − 680,000 = ₦196,000 A: revenue ₦46,000 A, variable costs ₦110,000 A, fixed costs ₦40,000 A.
  6. Net 180,000 F − 196,000 A = ₦16,000 A, which equals 484,000 − 500,000 (10).

(c) The volume was above budget, which added ₦180,000, but all three of price, variable cost and fixed cost were adverse and more than cancelled it, so profit fell short of the fixed budget by ₦16,000. Management should investigate the lower selling price and the higher variable and fixed costs (4).

Pathfinder on Fixed and flexed budgets

These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.

May Diet, 2025: Question 6 (15 marks)

Flexible budgets using high-low and step cost; variance report and follow-up.

Revise first: Layouts for flexed budgets and variance analysis

May Diet, 2024: Question 3 (20 marks)

Redraft flexed budget statement; behavioural problems and remedies.

Revise first: Layouts for flexed budgets and variance analysis

May Diet, 2022: Question 6 (15 marks)

Flexible budgets from high-low cost split with step cost; budget report and variance follow-up.

Revise first: Layouts for flexed budgets and variance analysis

March/July Diet, 2020: Question 2 (20 marks)

Redraft budget statement flexed to actual output; behavioural problems, remedies.

Revise first: Layouts for flexed budgets and variance analysis

Source: ICAN Pathfinder, Performance Management. Diets covered: March/July Diet, 2020 to May Diet, 2026. All 13 diets in the Pathfinder are mapped.

Spotted a mistake? Tell us and we will check it.

Where this fits

See every past question on Performance Management and the topic each one tests in the Pathfinder question finder.

This course builds on Management Accounting. After it, move on to Strategic Financial Management.

All Performance Management topics

You are reading topic 37 of 77.

  1. Information systems in organisations: role, costs and benefits01
  2. Internet, intranet, wireless technology and networks in business02
  3. Information needs at strategic, tactical and operational levels03
  4. TPS, MIS, EIS, ERP and CRM systems compared04
  5. Social and ethical issues in strategy and the management accountant’s data role05
  6. Big data principles and the big data pyramid06
  7. Big data, data mining and analytics: uses, benefits, challenges and risks07
  8. Activity based costing: cost pools, cost drivers and calculations08
  9. Activity based costing compared with traditional absorption costing09
  10. Target costing: principles and calculating the target cost10
  11. Managing the target cost gap and target costing in services11
  12. Life cycle costing: product life cycle stages and costs12
  13. Life cycle cost and profit calculations, and the benefits of life cycle costing13
  14. Throughput accounting: theory of constraints and the throughput accounting ratio14
  15. Environmental management accounting and sustainability in business15
  16. Environmental costs: methods, challenges and the management accountant’s role16
  17. Relevant costs and revenues, and opportunity cost17
  18. Relevant costs for specific decisions: materials, labour, equipment and overheads18
  19. Break-even analysis and margin of safety for Skills level decisions19
  20. Contribution to sales ratio, target profit and target revenue20
  21. Break-even charts and profit-volume charts21
  22. Multi-product CVP analysis and its limitations22
  23. Limiting factors: allocating a single scarce resource23
  24. Linear programming: formulation and graphical solution24
  25. Linear programming: slack and shadow prices25
  26. Price elasticity of demand and the factors that influence price26
  27. Demand and cost functions: profit-maximising price and output27
  28. Cost-based pricing: cost-plus and relevant-cost pricing28
  29. Market-based pricing: skimming, penetration and other strategies29
  30. Make-or-buy and outsourcing decisions30
  31. One-off contracts, shutdown and further processing of joint products31
  32. Reducing uncertainty: research, simulation and sensitivity analysis32
  33. Expected values and decision rules: maximax, maximin and minimax regret33
  34. Decision trees for multi-stage decisions34
  35. Value of perfect and imperfect information35
  36. Budgetary systems and types of budget: choosing the right one36
  37. Preparing fixed and flexed budgets37 here
  38. Rolling, activity-based, functional and master budgets38
  39. The beyond budgeting model: benefits and problems39
  40. Participation, negotiation and ethics in budgeting40
  41. High-low method and cost estimation for budgets41
  42. Correlation, regression and time series for budgeting and forecasting42
  43. Learning curve: learning rate and learning effect43
  44. Learning curve in budgeting: steady state and limitations44
  45. Standard costing: uses, how standards are set and types of standard45
  46. Basic variances: material, labour and idle time46
  47. Material mix and yield variances47
  48. Labour mix and yield variances48
  49. Sales mix and quantity variances49
  50. Planning and operational variances: revised budget, sales, market size and market share50
  51. Planning and operational variances for materials and labour51
  52. Overhead variances and reconciling budgeted and actual profit at Skills level52
  53. Behavioural effects of variances: motivation, JIT and TQM53
  54. Profitability ratios and financial performance measures54
  55. Liquidity, solvency and efficiency ratios55
  56. Non-financial performance indicators56
  57. Short-termism and financial manipulation of results57
  58. Sustainability and ESG performance measures58
  59. The balanced scorecard59
  60. The Fitzgerald and Moon building block model60
  61. Performance measurement in not-for-profit organisations61
  62. Value for money as a public sector objective62
  63. Divisional performance: return on investment and residual income63
  64. Economic value added (EVA)64
  65. Transfer pricing methods and the optimal transfer price65
  66. Transfer pricing: problems, tax and repatriation of funds66
  67. Value chain analysis for performance management67
  68. Complex business structures: alliances, joint ventures and supply chains68
  69. The performance pyramid69
  70. Value-based management70
  71. Corporate failure and life cycle issues71
  72. The Z-score and other quantitative failure models72
  73. The Argenti model and qualitative failure prediction73
  74. Preventing corporate failure and performance improvement strategies74
  75. Current developments in management accounting75
  76. Benchmarking and target setting in the public sector76
  77. The changing role of the management accountant and contemporary issues77
See the whole course

Get the complete Performance Management notes

Download as PDF or Word

  • Every topic as PDF and Word, ready to print
  • Edit it in Word or print the PDF. No retyping.
Get this course

Reading stays free. Access lasts 12 months. Pay by card, bank transfer, USSD or QR through Paystack. Your name and email appear on every page of your files. Read our Refund Policy.

PracticeNext topic