Most businesses do not price from a demand curve. A building contractor in Port Harcourt adds 25% to what a job costs. A garment factory adds a fixed percentage to the full cost of each style. A distributor adds a standard margin to the invoice price.
This habit is called cost-based pricing. The reason it is so common is that it is quick, it gives a price that covers cost, and everyone in the industry understands it. It also has weaknesses, which the examiner likes to test.
This topic explains cost-plus pricing on full cost and on marginal cost, the difference between a mark-up and a margin, how a change in the way costs are measured, such as a move to activity based costing, changes prices and then sales, and when pricing at relevant cost, which gives a minimum price, is appropriate. It builds on the earlier topic on demand and cost functions. The next topic covers market-based pricing: skimming, penetration and other strategies.
In 30 seconds
Cost-plus pricing sets the price as the cost plus a mark-up. On full cost (absorption cost) it adds a percentage to total unit cost, including an absorbed share of fixed overhead. On marginal cost it adds a larger percentage to variable cost so that the mark-up covers fixed cost and profit.
A mark-up is a percentage of cost. A margin is a percentage of the selling price: a 25% mark-up is a 20% margin (mark-up ÷ (1 + mark-up)), and a 30% margin is a 42.9% mark-up (margin ÷ (1 − margin)). Advantages: simple, quick, covers cost, easy to justify and to use for quotations.
Disadvantages: ignores demand, elasticity and competitors; depends on how fixed overhead is absorbed, which is arbitrary; can give a price that loses sales and profit; encourages inefficiency because costs are passed on. A change to activity based costing alters unit costs and so the cost-plus prices, and the effect on sales depends on elasticity. Relevant cost pricing gives the minimum price for a one-off job: the incremental cash flows.
Full marks come from the calculation, the conversion between mark-up and margin and a reasoned view of the method.
Cost-plus and marginal cost pricing
Full cost-plus pricing
The price is the full cost per unit plus a percentage mark-up. Full cost is direct materials, direct labour, variable overhead and an absorbed share of fixed production overhead (and sometimes a share of administration and selling costs). The mark-up gives the profit and may allow for the risk and capital employed.
- Advantages. It is simple and quick, which suits a business that has many products or must quote often. It ensures that, over time, each product covers its full cost. It is widely accepted: customers and contract partners understand it, and it can be used where the cost is the basis of a contract. Prices are stable, and rivals using the same mark-up may avoid price wars.
- Disadvantages. It ignores demand: the price that covers cost may be more than customers will pay or less than they would. It ignores competitors’ prices. The absorbed fixed overhead depends on the volume assumed and the base used, so the price depends on an arbitrary allocation. Using the budgeted volume can create a circle: a higher price cuts volume, which raises the absorbed cost per unit and calls for a higher price. It rewards inefficiency, since any extra cost is simply passed on. And a standard mark-up for all products ignores differences in elasticity.
Marginal cost-plus pricing
The price is the marginal (variable) cost plus a mark-up that is usually much larger, because it must cover all fixed cost and the profit. It focuses on contribution and avoids the arbitrary absorption of fixed overhead.
It is useful for short-term and special pricing, but the mark-up must be big enough to cover fixed costs over the long run. It may lead to prices that are too low if fixed costs are ignored.
Mark-up and margin
A mark-up is the profit as a percentage of cost. A margin is the profit as a percentage of the selling price. They describe the same profit differently, and a common error is to mix them.
- Margin = mark-up ÷ (1 + mark-up).
A 25% mark-up gives 0.25 ÷ 1.25 = 20%. - Mark-up = margin ÷ (1 − margin).
A 30% margin gives 0.30 ÷ 0.70 = 42.9%. - Price from cost with a mark-up: cost × (1 + mark-up). Price from cost with a margin: cost ÷ (1 − margin).
Costing methods, elasticity and relevant cost pricing
How a change in costing changes prices and sales
A business that prices at cost plus a standard mark-up lets its costing method set its prices. Moving from absorption by labour hours to activity based costing changes the unit cost of each product: low-volume, complex products usually cost more, and high-volume simple products cost less. With a fixed mark-up, their prices follow. What happens to sales depends on elasticity:
- If the cost, and so price, rises and demand is elastic, volume falls by a larger percentage than the price rise.
- If the price falls and demand is elastic, volume rises by more than the percentage cut.
- If demand is inelastic, volume hardly changes, whichever way the price moves.
This is why a company limited by cost-plus and a standard mark-up may be unable to raise revenue: the method fixes the prices, not the market. A better costing system helps only if prices respond to it intelligently, for example by cutting the price of products found to be over-costed in order to win sales, and raising the price of or dropping those that are under-costed.
Relevant cost pricing
For a one-off order that uses spare capacity, the minimum price is the relevant cost: the extra cash costs of the job, including the opportunity cost of any scarce resource used. At that price the company is no better and no worse off. A quotation should normally be higher, to give a profit, but the relevant cost shows the floor below which the order should not be accepted.
It is not suitable as a long-term price, because it makes no contribution to the fixed cost of the business and no return to investors, and because repeat business at that price would displace better orders.
Return on investment pricing, and why the absorption base changes the price
Return on investment (ROI) pricing is used where an investment centre must earn a target return on its capital. The price is set to cover cost and give that return: price = (budgeted total costs + target ROI × capital employed) ÷ budgeted volume. It is a way of choosing the profit element for cost-plus pricing, and the target can be varied with business risk.
Its weakness is the same as other cost-based methods: it pays no attention to what customers will pay, and the return is reached only if the budgeted volume is sold.
Example 3: ROI pricing. A division has non-current assets of ₦6,000,000 and working capital of ₦1,000,000. The target ROI is 12%. Budgeted volume is 50,000 units; variable cost is ₦80 a unit; fixed production costs ₦900,000 and fixed non-production costs ₦300,000. Required: the price by three methods, and the result if only 40,000 units are sold at the ROI price.
- Full cost.
Fixed 1,200,000 ÷ 50,000 = ₦24
full cost = 80 + 24 = ₦104.
Full cost plus 20% = ₦124.80. - Marginal cost plus 50%.
80 × 1.5 = ₦120. - ROI price.
Capital 7,000,000 × 12% = 840,000
per unit 840,000 ÷ 50,000 = ₦16.80
price = 104 + 16.80 = ₦120.80. - Volume shortfall.
At 40,000 units: revenue 4,832,000; costs 80 × 40,000 + 1,200,000 = 4,400,000; profit ₦432,000, a return of 6.2% on ₦7,000,000, about half the target.
A cost-based price protects the target only if the volume is achieved.
Example 4: the absorption base. A factory has overhead of ₦1,200,000 and makes 1,000 units each of X and Y. X uses 2 labour hours and 1 machine hour, Y uses 3 labour hours and 2 machine hours. Direct costs are ₦300 for X and ₦350 for Y. The mark-up is 20% on full cost.
- Labour hour basis. 5,000 hours; rate ₦240. X overhead 480, Y 720.
Prices: X (300 + 480) × 1.2 = ₦936
Y (350 + 720) × 1.2 = ₦1,284. - Machine hour basis. 3,000 hours; rate ₦400. X overhead 400, Y 800.
Prices: X (300 + 400) × 1.2 = ₦840
Y (350 + 800) × 1.2 = ₦1,380. - Lesson. The same mark-up gives different prices (X ₦96 lower, Y ₦96 higher) merely because the base changes, which shows that the choice of mark-up and of absorption method is arbitrary.
Layouts for cost-based prices
- Full cost per unit. Direct materials + direct labour + variable overhead + fixed overhead absorbed (budgeted fixed overhead ÷ budgeted units).
- Price with a mark-up. Cost × (1 + mark-up %).
- Margin on sales. (Price − cost) ÷ price.
- Price on marginal cost. Variable cost × (1 + mark-up %).
- Effect of a price change on volume. % change in price × elasticity = % change in volume.
- New revenue. New price × new volume.
Money is in naira and each answer is rounded once, at the end.
Worked examples
Example 1: mark-up and margin. A product has direct materials of ₦300, direct labour of ₦120 and absorbed overhead of ₦80 a unit. The firm adds a 25% mark-up to full cost. Required: the price, the margin on sales and the mark-up that would give a 30% margin.
- Full cost.
300 + 120 + 80 = ₦500. - Price.
500 × 1.25 = ₦625. - Margin.
(625 − 500) ÷ 625 = 20.0% of sales. - Mark-up for a 30% margin.
0.30 ÷ 0.70 = 42.9% of cost, giving a price of 500 ÷ 0.70 = ₦714.29.
Example 2: activity based costing and cost-plus prices. Three products each sell 10,000 units now. Full cost under the labour-hour method is A ₦400, B ₦600 and C ₦500. Under activity based costing it is A ₦460, B ₦540 and C ₦520. The mark-up is 20% on cost. Demand for A is elastic with an elasticity of 1.5, B has an elasticity of 1.5 and C is inelastic at 0.2.
Required: the old and new prices, and the new revenue of each product.
- Old prices.
A 400 × 1.2 = ₦480
B 600 × 1.2 = ₦720
C 500 × 1.2 = ₦600.
Old revenue: ₦4.8m, ₦7.2m and ₦6.0m. - New prices.
A 460 × 1.2 = ₦552 (up 15%)
B 540 × 1.2 = ₦648 (down 10%)
C 520 × 1.2 = ₦624 (up 4%). - Volume changes.
A: 15% × 1.5 = −22.5%, so 7,750 units.
B: 10% × 1.5 = +15%, so 11,500 units.
C: 4% × 0.2 = −0.8%, so 9,920 units. - New revenue.
A 552 × 7,750 = ₦4,278,000.
B 648 × 11,500 = ₦7,452,000.
C 624 × 9,920 = ₦6,190,080. - Comment. A loses revenue, because its price rises when its demand is elastic; B gains because its price falls; C gains slightly because demand is inelastic. A company should price A with care and consider cutting B further, rather than just applying the mark-up.
Expect variants: a different base for the mark-up, marginal cost-plus, a question that asks for the effect on volume only, or a discussion of the method.
Common mistakes
- Mixing mark-up and margin. State which one is used.
- Adding the mark-up to the wrong cost. Full-cost pricing uses full cost; marginal pricing uses variable cost.
- Ignoring elasticity when asked about the effect on sales.
- Treating relevant cost as a selling price. It is the minimum.
- Listing advantages only. The weaknesses carry as many marks.
- Forgetting that absorbed overhead depends on volume.
Quick revision
- Price = cost × (1 + mark-up).
Margin = mark-up ÷ (1 + mark-up)
mark-up = margin ÷ (1 − margin). - Full cost-plus: simple, covers cost; ignores demand and competition; overhead absorption arbitrary.
- Marginal cost-plus: large mark-up on variable cost; focuses on contribution.
- Costing change alters prices; elasticity decides the effect on sales.
- Relevant cost pricing gives the minimum price for a one-off order.
How the marks are earned
- Calculate: full cost, price, margin, with the layout.
- Discuss: advantages and disadvantages, with the product in the question.
- Apply elasticity: price change, volume change and revenue.
Practice questions
These are original questions, written in the style of the Skills examination. Work each one before you open the answer.
Recall check: multiple choice
Question 1. Cost-plus pricing:
- Ignores cost
- Adds a mark-up to the cost
- Is set by the customer
- Uses only market price
Show the answer
B. The mark-up gives the profit.
Question 2. A 25% mark-up on cost is a margin on sales of:
- 25%
- 30%
- 20%
- 15%
Show the answer
C. 0.25 ÷ 1.25 = 20%.
Question 3. An advantage of cost-plus pricing is that it is:
- Simple and quick
- Based on demand
- Sensitive to rivals
- Always profit-maximising
Show the answer
A. It also covers cost.
Question 4. A disadvantage of cost-plus pricing is that it:
- Is too complex
- Needs no data
- Covers no cost
- Ignores demand and competitors
Show the answer
D. The overhead absorption is also arbitrary.
Question 5. Full cost includes:
- An absorbed share of fixed overhead
- Only direct materials
- Only labour
- No overhead
Show the answer
A. It is the absorption cost.
Question 6. Marginal cost-plus pricing:
- Uses full cost
- Uses no mark-up
- Adds a larger mark-up to variable cost
- Ignores variable cost
Show the answer
C. The mark-up must cover fixed cost and profit.
Question 7. Moving to activity based costing changes cost-plus prices because:
- The mark-up is abolished
- Demand changes
- Tax changes
- Unit product costs change
Show the answer
D. Prices follow cost with a fixed mark-up.
Question 8. Relevant cost pricing gives the:
- Minimum price for a one-off order
- Maximum price
- Market price
- Long-run price
Show the answer
A. It leaves the company no better and no worse off.
Question 9. If a cost-plus price rises and demand is elastic, volume:
- Rises
- Stays the same
- Falls by a larger percentage than the price rise
- Doubles
Show the answer
C. Elasticity above 1.
Question 10. Cost-plus pricing is popular mainly because it is:
- Always optimal
- Standard practice in many industries and easy to justify
- Free
- Illegal to change
Show the answer
B. It is quick and understood.
Section B style: written questions
Question 11 (10 marks). (a) Explain the difference between a mark-up and a margin. (3 marks) (b) State THREE advantages and THREE disadvantages of full cost-plus pricing. (6 marks) (c) State when relevant cost pricing is used. (1 mark)
Question 12 (15 marks). A product has direct materials ₦180, direct labour ₦90 and variable overhead ₦30 a unit. Budgeted fixed production overhead is ₦3,600,000 for 30,000 units.
(a) Calculate the full cost per unit. (4 marks) (b) Calculate the price with a 30% mark-up on full cost. (2 marks) (c) Calculate the margin on sales. (2 marks) (d) Calculate the price with an 80% mark-up on marginal cost. (3 marks) (e) Compare the two prices and comment. (4 marks)
Question 13 (20 marks). A company uses a 25% mark-up on full cost. Full cost under labour-hour absorption is X ₦800, Y ₦1,000 and Z ₦700. Under activity based costing it is X ₦880, Y ₦920 and Z ₦735. Elasticities: X 2.0, Y 1.5, Z 0.4.
(a) Calculate the price of each product under both methods. (6 marks) (b) Calculate the percentage change in each price. (3 marks) (c) Calculate the percentage change in volume of each. (3 marks) (d) Discuss the effect on sales and the pricing policy. (8 marks)
Model answers
Show the model answer to Question 11
(a) A mark-up is profit as a percentage of cost; a margin is profit as a percentage of selling price. A 25% mark-up is a 20% margin (3).
(b) Advantages, any three: simple and quick; ensures cost is covered; widely accepted; useful for quotations; stable prices. Disadvantages, any three: ignores demand; ignores competitors; overhead absorption is arbitrary; depends on volume; passes on inefficiency; ignores differences in elasticity (1 each).
(c) For a one-off order using spare capacity, to find the minimum price (1).
Show the model answer to Question 12
(a)
- Fixed overhead per unit 3,600,000 ÷ 30,000 = ₦120.
- Full cost 180 + 90 + 30 + 120 = ₦420 (4).
(b) 420 × 1.30 = ₦546 (2).
(c) (546 − 420) ÷ 546 = 23.1% (2).
(d)
- Marginal cost 180 + 90 + 30 = 300
- 300 × 1.80 = ₦540 (3).
(e) The prices are close (₦546 and ₦540). The full cost price depends on the 30,000-unit volume assumed: at lower volume the absorbed overhead per unit would be higher and the price would rise. The marginal price shows contribution and does not depend on volume, but the mark-up must be big enough to cover fixed cost (4).
Show the model answer to Question 13
(a)
- Labour-hour.
X 800 × 1.25 = ₦1,000 - Y 1,000 × 1.25 = ₦1,250
- Z 700 × 1.25 = ₦875.
- Activity based.
X 880 × 1.25 = ₦1,100 - Y 920 × 1.25 = ₦1,150
- Z 735 × 1.25 = ₦918.75 (6).
(b)
- X +100 ÷ 1,000 = +10%
- Y −100 ÷ 1,250 = −8.0%
- Z +43.75 ÷ 875 = +5.0% (3).
(c)
- X 10% × 2.0 = −20%
- Y 8% × 1.5 = +12%
- Z 5% × 0.4 = −2% (3).
(d) X: a higher price with elastic demand loses a fifth of the volume, so revenue falls; the company should consider not raising the price fully. Y: a lower price with elastic demand gains volume, which raises revenue. Z: inelastic demand keeps volume almost the same, so the rise adds revenue.
The method fixes prices by cost and the market sets the volume, so the company should combine the better costing with attention to elasticity and competitors, and consider the effect on contribution and capacity (8).
Pathfinder on Cost-based pricing
These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.
Relevant cost schedule for a contract (nine items); limits of relevant costing; skimming launch price.
Revise first: Layouts for cost-based prices
Skimming, penetration and parity pricing for a new executive car; recommendation.
Revise first: Layouts for cost-based prices
LP concept and uses; cost-plus prices; optimal output; shadow prices (e: NPV/IRR outside course).
Revise first: Layouts for cost-based prices
Absorption v ABC cost, effect on cost-plus prices and sales with elasticity.
Revise first: Layouts for cost-based prices
Source: ICAN Pathfinder, Performance Management. Diets covered: March/July Diet, 2020 to May Diet, 2026. All 13 diets in the Pathfinder are mapped.
Spotted a mistake? Tell us and we will check it.