Life Cycle Costing: Product Life Cycle Stages and the Costs of Each

ICAN Skills, Performance Management. Syllabus area B: Advanced costing techniques.

11 min read · Updated 8 November 2026

Download this topic

In this part

A hospital buys a generator for the lowest price on the quotation. Over the next ten years it pays more for diesel, repairs and spare parts than the generator cost, and at the end it pays to remove the old unit.

A manufacturer launches a product that sells well and then discovers that the price it set in the first year cannot recover the research, the marketing and the cost of withdrawing it. Both mistakes come from looking at one part of cost. Life cycle costing looks at all of it, from the first decision to the last cost of disposal.

This topic explains what life cycle costing is, the three categories of cost over the life of an asset or product, the stages of a product’s life and the costs that belong to each, and why so much cost is fixed early. It builds on the target costing and cost gap topic, because target costing and life cycle costing work together.

The next topic covers life cycle cost and profit calculations and the benefits of the method.

In 30 seconds

Life cycle costing (LCC), also called whole life costing, identifies the total cost of owning an asset or making and selling a product over its whole life, so that decisions are based on all costs, not just the purchase price. It applies to major asset acquisitions and to new products. Costs fall into three categories: acquisition (set-up or market entry) costs, operating or running costs, and end-of-life costs.

A large share of life cycle cost is committed at the start, when the decision is made. A product passes through development, introduction, growth, maturity, decline and withdrawal, and its prices, costs, investment and marketing change at each stage. Full marks come from listing the cost categories and stage costs and applying them to the business in the question.

What life cycle costing is

Life cycle costing tries to identify the total cost associated with owning an asset, so that decisions on acquisitions can be made on all the costs. It recognises that a decision at the time of acquisition locks in costs for the future. The principle applies to complex and simple purchases alike.

A person who buys a printer is committed to buying the compatible toner cartridges, so choosing between two printers on price alone can be a mistake if the cheaper printer has dearer cartridges. A company that buys a complex asset will also care about reliability, servicing time and maintenance costs.

LCC can be applied to major asset acquisitions and to the introduction of new products to the market.

Three categories of cost

  • Acquisition, set-up or market entry costs. Costs incurred at the start to bring the product into production and start selling it, or to complete the construction of a building or other major asset. They are usually one-off capital items and other once-only costs, such as training staff and setting up documentation and performance reporting.
  • Operational or running costs. Regular and recurring costs throughout the life of the product or asset. They may change over time: maintenance of equipment, such as lifts in a building, tends to rise as the asset ages.
  • End-of-life costs. One-off costs to withdraw the product from the market or demolish or dispose of the asset at the end of its life.

Although costs arise throughout the life, a large proportion is committed very early, when the decision to develop the product or build the asset is made. This is why choices made at the design and purchase stage matter most.

Buildings and other constructed assets

Several designs may be considered for a building, each with a different initial capital cost and different annual running costs. An energy-efficient design lowers energy costs every year. The choice of materials affects the life of the building and the cost of repairs. The design can affect demolition costs.

The preferred design may be the one with the lowest total cost over the building’s life, or the one that gives the best value for money (benefits less costs) over that life. A proper decision needs all costs identified and estimated, and discounted, because ₦1 now is worth more than ₦1 in the future.

Product life cycle stages and their costsSix stages left to right: development, introduction, growth, maturity, decline and withdrawal. Under each, the main costs: research and capital spending, marketing and distribution set-up, capacity and working capital, upkeep and enhancement, close cost watch, and decommissioning.DevelopmentIntroductionGrowthMaturityDeclineWithdrawalDevelopment: research, design, capital spending. Introduction: marketing, distribution.Growth: capacity, working capital. Maturity: upkeep, product enhancement.Decline: watch cost closely. Withdrawal: decommissioning, restructuring, warranties.Most cost is committed in the first stage, long before most of it is spent

The stages of a product life cycle and their costs

Most products made in large quantities and sold to customers pass through six stages: development, introduction, growth, maturity, decline and withdrawal. At each stage the selling price, the costs, the capital invested and the spending on advertising and marketing may differ.

LCC is important in new product launches because the company wants to make a profit on the whole life, so it must recover all the costs: research and development, training, machinery, production, distribution and selling, marketing, working capital, and retirement and disposal.

  • Product development. Research and development costs and capital expenditure decisions. Decisions here affect all later costs.
  • Introduction to the market. Operating costs begin. Marketing and advertising to raise awareness, with a strong focus on market share, and set-up and expansion of distribution channels.
  • Growth. Costs of increasing capacity, perhaps a learning effect and economies of scale, and higher working capital as sales rise.
  • Maturity. Costs to maintain manufacturing capacity, and marketing and product enhancement costs to extend maturity.
  • Decline. Close attention to cost, because the decision to withdraw may be expensive.
  • Withdrawal. Decommissioning costs for assets, possible restructuring costs, and warranties that must still be supported.

Using the stages

A product’s sales revenue and profit follow a typical pattern: little or negative profit in development and introduction, rising profit in growth, the highest profit in maturity, and falling profit in decline. Knowing the pattern helps management to set prices for each stage, to interpret changes in performance (a fall in profit in decline is expected), and to decide on new investment or withdrawal.

The next topic shows how to calculate life cycle cost and profit.

Layouts for life cycle cost

  1. Capital cost of an asset = initial cost − scrap or residual value.
  2. Number of services = life in miles (or hours) ÷ service interval. Service cost = number of services × cost per service.
  3. Running cost = life × running cost per mile (or hour).
  4. Life cycle cost = capital cost + service cost + running cost (+ end-of-life cost). Cost per mile or hour = life cycle cost ÷ life.
  5. Share of cost at a stage = stage cost ÷ total life cycle cost × 100.

Discounting is added in the next topic. Here money is in naira, per-unit figures are rounded once at the end, and percentages to one decimal place.

Worked examples

Example 1: choosing between two lorries. A haulier will run a lorry for 120,000 km and then sell it. Lorry A: cost ₦12,000,000, service every 10,000 km at ₦450,000, running cost ₦680 per km, scrap value ₦1,500,000. Lorry B: cost ₦18,000,000, service every 20,000 km at ₦520,000, running cost ₦480 per km, scrap value ₦4,000,000. Required: the life cycle cost of each and the cost per km.

  1. Lorry A.
    Capital 12,000,000 − 1,500,000 = ₦10,500,000.
    Services 120,000 ÷ 10,000 = 12 × 450,000 = ₦5,400,000.
    Running 120,000 × 680 = ₦81,600,000.
    Life cycle cost ₦97,500,000; per km 97,500,000 ÷ 120,000 = ₦812.50.
  2. Lorry B.
    Capital 18,000,000 − 4,000,000 = ₦14,000,000.
    Services 6 × 520,000 = ₦3,120,000.
    Running 120,000 × 480 = ₦57,600,000.
    Life cycle cost ₦74,720,000; per km ₦622.67.
  3. Comparison. Lorry B costs ₦6,000,000 more to buy but ₦22,780,000 less over its life. Lorry B is the better choice on cost. The comparison ignores the time value of money, which should be added when the costs fall over many years. The lorry’s reliability and availability, which should be considered too.

Example 2: where product cost arises. A product’s life cycle costs total ₦300m: development ₦60m, introduction ₦30m, growth ₦75m, maturity ₦90m, decline ₦30m, withdrawal ₦15m. Experience shows that about 80% of the life cycle cost is determined by decisions taken in development. Required: each stage’s share, and a comment on cost commitment.

  1. Shares.
    Development 60 ÷ 300 = 20.0%; introduction 10.0%; growth 75 ÷ 300 = 25.0%; maturity 90 ÷ 300 = 30.0%; decline 10.0%; withdrawal 15 ÷ 300 = 5.0%.
    Total 100%.
  2. Committed cost.
    80% × ₦300m = ₦240m, though only ₦60m (20.0%) is spent in development.
  3. Comment. The development team makes decisions that fix four-fifths of the cost, while spending a fifth. Cost control and target costing must therefore be applied at the design stage, because by maturity there is little left to save.

Expect variants: servicing by hours, a residual value that is negative (a disposal cost), different lives for the options, or running costs that rise each year.

Common mistakes

  • Choosing on purchase price. The dearer asset may be cheaper over its life.
  • Forgetting the scrap value or the end-of-life cost.
  • Wrong number of services. Divide the life by the interval.
  • Mixing stages with cost categories. Stages are in time; categories are acquisition, operating and end-of-life.
  • Ignoring committed cost. Most cost is fixed by early decisions.
  • Ignoring non-financial factors such as reliability and servicing time.

Quick revision

  • LCC = whole life costing; total cost of ownership or of a product over its life; for asset purchases and new products.
  • Categories: acquisition, operating, end-of-life. Early decisions commit most cost.
  • Stages: development, introduction, growth, maturity, decline, withdrawal, with costs listed above.
  • Buildings: lowest total cost or best value over the life; discount the costs.
  • Compare options by life cycle cost per unit of use.

How the marks are earned

  • Explain LCC: the idea, its two uses and the committed-cost point.
  • List costs: one mark for each cost category or stage cost, with an example.
  • Calculate: capital cost, services, running, total and per unit; then a conclusion.

Practice questions

These are original questions, written in the style of the Skills examination. Work each one before you open the answer.

Recall check: multiple choice

Question 1. Life cycle costing identifies:

  1. Only the purchase price
  2. The total cost of owning an asset or making a product over its whole life
  3. Only running costs
  4. Only tax
Show the answer

B. It is also called whole life costing.

Question 2. Another name for life cycle costing is:

  1. Whole life costing
  2. Marginal costing
  3. Process costing
  4. Standard costing
Show the answer

A. Both look at the cost over the whole life.

Question 3. The three categories of life cycle cost are:

  1. Fixed, variable and mixed
  2. Direct, indirect and overhead
  3. Labour, material and tax
  4. Acquisition, operating and end-of-life
Show the answer

D. Acquisition costs are also called set-up or market entry costs.

Question 4. A large proportion of life cycle cost is committed at:

  1. The end of life
  2. Maturity
  3. The decision or design stage
  4. Decline
Show the answer

C. Early decisions lock in later costs.

Question 5. End-of-life costs are:

  1. Regular annual costs
  2. One-off costs to withdraw a product or demolish an asset
  3. Marketing costs at launch
  4. Training costs
Show the answer

B. They arise once, at the end.

Question 6. The first stage of the product life cycle is:

  1. Development
  2. Maturity
  3. Decline
  4. Withdrawal
Show the answer

A. Research and design costs arise here.

Question 7. Heavy marketing and the set-up of distribution channels are typical of:

  1. Withdrawal
  2. Maturity
  3. Introduction
  4. Decline
Show the answer

C. The focus is on awareness and market share.

Question 8. In the decline stage, management should:

  1. Ignore costs
  2. Launch new products only
  3. Stop all reporting
  4. Watch costs closely, because withdrawal may be expensive
Show the answer

D. Decommissioning and warranties follow.

Question 9. The maintenance cost of equipment tends to:

  1. Fall as it ages
  2. Stay at zero
  3. Rise as it ages
  4. Disappear
Show the answer

C. Running costs may change over time.

Question 10. When choosing between building designs, the preferred design may be the one with:

  1. The lowest total cost over the building’s life, or the best value for money
  2. The lowest initial cost only
  3. The highest initial cost
  4. The shortest life
Show the answer

A. Costs should also be discounted.

Section B style: written questions

Question 11 (10 marks). (a) Explain life cycle costing and why it matters at the design stage. (4 marks) (b) Describe the three categories of life cycle cost. (6 marks)

Question 12 (15 marks). A firm will run a machine for 20,000 hours. Machine M: cost ₦8,000,000, maintenance every 2,000 hours at ₦150,000, running cost ₦400 an hour, scrap ₦500,000. Machine N: cost ₦11,000,000, maintenance every 4,000 hours at ₦200,000, running cost ₦300 an hour, scrap ₦1,500,000.

(a) Calculate the capital cost of each machine. (2 marks) (b) Calculate the maintenance cost of each. (4 marks) (c) Calculate the running cost of each. (2 marks) (d) Calculate the life cycle cost and cost per hour of each. (4 marks) (e) Advise, including two other factors. (3 marks)

Question 13 (20 marks). A product’s life cycle costs (₦m) are: development 48, introduction 24, growth 60, maturity 72, decline 24, withdrawal 12.

(a) Calculate the total and each stage’s percentage of the total. (6 marks) (b) About 75% of the total is committed in development. Calculate the committed amount and compare it with the amount spent in development. (3 marks) (c) Discuss how costs, prices and marketing change through the stages. (8 marks) (d) State THREE decisions that an understanding of the life cycle helps. (3 marks)

Model answers

Show the model answer to Question 11

(a) Life cycle costing identifies the total cost of owning an asset or of making and selling a product over its whole life (2). It matters at design because a large proportion of cost is committed at the start, and savings are much easier before production is set up (2).

(b) Acquisition or set-up costs: costs to bring the product or asset into use, such as capital expenditure and staff training, usually one-off (2). Operating costs: recurring costs through the life, such as maintenance, which may rise with age (2). End-of-life costs: one-off costs to withdraw the product or dispose of or demolish the asset (2).

Show the model answer to Question 12

(a)

  1. M: 8,000,000 − 500,000 = ₦7,500,000.
  2. N: 11,000,000 − 1,500,000 = ₦9,500,000 (2).

(b)

  1. M: 20,000 ÷ 2,000 = 10 × 150,000 = ₦1,500,000.
  2. N: 20,000 ÷ 4,000 = 5 × 200,000 = ₦1,000,000 (4).

(c)

  1. M: 20,000 × 400 = ₦8,000,000.
  2. N: 20,000 × 300 = ₦6,000,000 (2).

(d)

  1. M: 7,500,000 + 1,500,000 + 8,000,000 = ₦17,000,000
  2. ÷ 20,000 = ₦850 an hour.
  3. N: 9,500,000 + 1,000,000 + 6,000,000 = ₦16,500,000
  4. ÷ 20,000 = ₦825 an hour (4).

(e) N is cheaper by ₦500,000 over the life, so choose N on cost (1). Other factors, any two:

  • reliability and breakdown time
  • the time value of money, since N costs more up front
  • supplier support and spare parts
  • finance available
  • the risk that actual running hours differ (2)
Show the model answer to Question 13

(a)

  1. Total 48 + 24 + 60 + 72 + 24 + 12 = ₦240m.
  2. Development 20.0%; introduction 10.0%; growth 25.0%; maturity 30.0%; decline 10.0%; withdrawal 5.0% (6).

(b) Committed 75% × 240 = ₦180m, against ₦48m (20.0%) spent in development (3).

(c) Development: research, design and capital spending, no revenue. Introduction: heavy marketing and distribution set-up with a focus on market share, a launch price to win share, low or negative profit. Growth: rising sales and capacity, working capital increases, possible learning effect and economies of scale. Maturity: highest profit, sales stop rising, prices may be cut, spending on maintaining capacity and enhancing the product to extend life.

Decline: falling sales and profit, close cost control, withdrawal planning. Withdrawal: decommissioning, restructuring and warranty costs (any eight points, 1 each).

(d) Pricing; performance management, since changes in profit may reflect the stage; decisions on new investment or withdrawal (1 each).

Pathfinder on Life cycle costing: stages and costs

These are the ICAN Pathfinder questions that test this topic. ICAN owns the questions and the suggested solutions, so we point you to them and do not copy them. Open your Pathfinder, attempt each question under exam conditions, then check your answer against the notes above.

November Diet, 2024: Question 1 (30 marks)

Price, mix, yield, sales price, market size and share variances; strategy in a declining market.

Revise first: What life cycle costing is

November Diet, 2024: Question 7 (15 marks)

Product life cycle: likely unit price and unit cost changes in growth and maturity stages after skimming launch.

Revise first: What life cycle costing is

Source: ICAN Pathfinder, Performance Management. Diets covered: March/July Diet, 2020 to May Diet, 2026. All 13 diets in the Pathfinder are mapped.

Spotted a mistake? Tell us and we will check it.

Where this fits

See every past question on Performance Management and the topic each one tests in the Pathfinder question finder.

This course builds on Management Accounting. After it, move on to Strategic Financial Management.

All Performance Management topics

You are reading topic 12 of 77.

  1. Information systems in organisations: role, costs and benefits01
  2. Internet, intranet, wireless technology and networks in business02
  3. Information needs at strategic, tactical and operational levels03
  4. TPS, MIS, EIS, ERP and CRM systems compared04
  5. Social and ethical issues in strategy and the management accountant’s data role05
  6. Big data principles and the big data pyramid06
  7. Big data, data mining and analytics: uses, benefits, challenges and risks07
  8. Activity based costing: cost pools, cost drivers and calculations08
  9. Activity based costing compared with traditional absorption costing09
  10. Target costing: principles and calculating the target cost10
  11. Managing the target cost gap and target costing in services11
  12. Life cycle costing: product life cycle stages and costs12 here
  13. Life cycle cost and profit calculations, and the benefits of life cycle costing13
  14. Throughput accounting: theory of constraints and the throughput accounting ratio14
  15. Environmental management accounting and sustainability in business15
  16. Environmental costs: methods, challenges and the management accountant’s role16
  17. Relevant costs and revenues, and opportunity cost17
  18. Relevant costs for specific decisions: materials, labour, equipment and overheads18
  19. Break-even analysis and margin of safety for Skills level decisions19
  20. Contribution to sales ratio, target profit and target revenue20
  21. Break-even charts and profit-volume charts21
  22. Multi-product CVP analysis and its limitations22
  23. Limiting factors: allocating a single scarce resource23
  24. Linear programming: formulation and graphical solution24
  25. Linear programming: slack and shadow prices25
  26. Price elasticity of demand and the factors that influence price26
  27. Demand and cost functions: profit-maximising price and output27
  28. Cost-based pricing: cost-plus and relevant-cost pricing28
  29. Market-based pricing: skimming, penetration and other strategies29
  30. Make-or-buy and outsourcing decisions30
  31. One-off contracts, shutdown and further processing of joint products31
  32. Reducing uncertainty: research, simulation and sensitivity analysis32
  33. Expected values and decision rules: maximax, maximin and minimax regret33
  34. Decision trees for multi-stage decisions34
  35. Value of perfect and imperfect information35
  36. Budgetary systems and types of budget: choosing the right one36
  37. Preparing fixed and flexed budgets37
  38. Rolling, activity-based, functional and master budgets38
  39. The beyond budgeting model: benefits and problems39
  40. Participation, negotiation and ethics in budgeting40
  41. High-low method and cost estimation for budgets41
  42. Correlation, regression and time series for budgeting and forecasting42
  43. Learning curve: learning rate and learning effect43
  44. Learning curve in budgeting: steady state and limitations44
  45. Standard costing: uses, how standards are set and types of standard45
  46. Basic variances: material, labour and idle time46
  47. Material mix and yield variances47
  48. Labour mix and yield variances48
  49. Sales mix and quantity variances49
  50. Planning and operational variances: revised budget, sales, market size and market share50
  51. Planning and operational variances for materials and labour51
  52. Overhead variances and reconciling budgeted and actual profit at Skills level52
  53. Behavioural effects of variances: motivation, JIT and TQM53
  54. Profitability ratios and financial performance measures54
  55. Liquidity, solvency and efficiency ratios55
  56. Non-financial performance indicators56
  57. Short-termism and financial manipulation of results57
  58. Sustainability and ESG performance measures58
  59. The balanced scorecard59
  60. The Fitzgerald and Moon building block model60
  61. Performance measurement in not-for-profit organisations61
  62. Value for money as a public sector objective62
  63. Divisional performance: return on investment and residual income63
  64. Economic value added (EVA)64
  65. Transfer pricing methods and the optimal transfer price65
  66. Transfer pricing: problems, tax and repatriation of funds66
  67. Value chain analysis for performance management67
  68. Complex business structures: alliances, joint ventures and supply chains68
  69. The performance pyramid69
  70. Value-based management70
  71. Corporate failure and life cycle issues71
  72. The Z-score and other quantitative failure models72
  73. The Argenti model and qualitative failure prediction73
  74. Preventing corporate failure and performance improvement strategies74
  75. Current developments in management accounting75
  76. Benchmarking and target setting in the public sector76
  77. The changing role of the management accountant and contemporary issues77
See the whole course

Get the complete Performance Management notes

Download as PDF or Word

  • Every topic as PDF and Word, ready to print
  • Edit it in Word or print the PDF. No retyping.
Get this course

Reading stays free. Access lasts 12 months. Pay by card, bank transfer, USSD or QR through Paystack. Your name and email appear on every page of your files. Read our Refund Policy.

PracticeNext topic